Cameron Cottage, Legard South, Spanish Point Miltown Malbay Co. Clare V95 H3V2
Proposed development
Of the development which consists of: i) construction of bedroom extension to existing south facing gable, ii) provision of rooflights to wc & utility area, iii) change of elevational treatment to ancillary garden store/home office, as previously granted permission under planning reference 15/729, and all associated works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 21 Oct 2025
- Residential units
- 1
- Floor area
- 144 m²
Timeline
Application received
27 Aug 2025
Decision due
21 Oct 2025
Decision: conditional
10 Oct 2025
Grant issued
13 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct new side and rear extensions to existing dwelling, construct a new garage to rear of existing dwelling and install a new wastewater treatment system along with all associated works
to construct a dwelling house, home office and shed and the installation of a proprietary onsite waste water treatment system. Permission is also sought for the alteration of Condition No.15 of outline planning permission, P2560436, to allow for the inclusion of a new access point onto the public road along with ancillary site works
of the changes made to dwelling house which include the finished floor level, window / door / rooflight positions, roof finish, gutters / downpipes / fascia and the front boundary wall / site entrance along with ancillary site works
for following; a) to retain the re-construction of a roof and change in height of a shed structure b) permission to install a new window in the shed structure
for the construction of a New Training Pitch, storage shed, extension of existing service road, associated pitch drainage, and all associated ancillary site works
for development at Armada House, Leagard South, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The works involve installing an external fire escape stairs in the internal courtyard, replacing two existing windows with two doors to allow for access onto the external stairs, a roller shutter over an existing window in the courtyard and to move the boiler house door to the side elevation along with associated site works