Cootehill Enterprise Park, Errigal Cootehill, Co. Cavan.
Proposed development
To erect a double-height light industrial warehouse building (with a gross floor area of 430 m2), incorporating ancillary office / staff accommodation including welfare facilities, service yard and loading/unloading area, access off existing service road (under construction), parking, signage, landscaping, lighting, boundary treatments, connection to public sewer, surface water, watermain and utility services and all ancillary and associated works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 21 Apr 2026
Timeline
Application received
25 Feb 2026
Decision due
21 Apr 2026
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,416 sq.m. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: • Construction of 2 no. primary digesters (with an overall height of c. 11.5m), a pump house (with a gross floor area (GFA) of c. 360.5 sq.m), and 2 no. post digester tanks (with an overall height of c. 11.5m), located centrally on site. • Construction of a digestate storage tank (c. 16.4m in height) and a fuel tank (c. 2m in height) located in the northern section of the site, to the north of the primary and post digester tanks. • Construction of roofed silage clamps (with a GFA of c. 928.3 sq.m and a height of c. 8.7m) and 2 no. prepits (c. 4.3m in height), located in the western section of the site, to the west of the primary and post digester tanks. • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12.1m and a GFA of c. 1,703.7 sq.m) with odour abatement system (with a height of c. 13m to odour abatement stack), located in the southwestern section of the site, to the south of the roofed silage clamps. • Construction of a pasteurisation buffer tank (c. 4.3m in height), a pasteurisation unit (with a maximum height of c. 4.2m), a combined heat and power (CHP) unit (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 38.5 sq.m), a biomethane boiler (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 12.74 sq.m), a gas treatment system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the primary digesters, within the central section of the site. • Construction of a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels) and a grid injection unit (with a height of c. 2.8m and a GFA of c. 21.7 sq.m), located to the south of the gas treatment system, in the south-central section of the site. • Construction of a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 23.5 sq.m and a height of c. 3.4m), located in the southeastern section of the site. • Constr
for erection of a fully serviced Industrial/Warehouse building including ground & first-floor administration and staff facilities and first-floor storage mezzanine. Also included in the application is building signage, car parking, bike shelter, landscaping, boundary treatments, connection to existing services, new vehicular entrance and all associated and ancillary site works
to erect a fully serviced Industrial Warehouse Building comprising of administration & staff facilities and a first-floor storage mezzanine. Also included in the application is building signage, car parking, bike shelter, landscaping, boundary treatments, connection to existing services and new vehicular entrance from the previously approved service road (under construction) and all ancillary site works
to erect a double-height light industrial warehouse building (with a gross floor area of 430 m2), incorporating ancillary office / staff accommodation including welfare facilities, service yard and loading/unloading area, access off existing service road (under construction), parking, signage, landscaping, lighting, boundary treatments, connection to public sewer, surface water, watermain and utility services and all ancillary and associated works - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
- RED III - for 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works
- RED III - for a 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works