Drumman and Errigal, Cootehill, Co. Cavan
Proposed development
- RED III - for a 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- Not available
Timeline
Application received
29 Sept 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to erect a fully serviced Industrial Warehouse Building comprising of administration & staff facilities and a first-floor storage mezzanine. Also included in the application is building signage, car parking, bike shelter, landscaping, boundary treatments, connection to existing services and new vehicular entrance from the previously approved service road (under construction) and all ancillary site works
to erect a double-height light industrial warehouse building (with a gross floor area of 430 m2), incorporating ancillary office / staff accommodation including welfare facilities, service yard and loading/unloading area, access off existing service road (under construction), parking, signage, landscaping, lighting, boundary treatments, connection to public sewer, surface water, watermain and utility services and all ancillary and associated works - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
to erect a double-height light industrial warehouse building (with a gross floor area of 430 m2), incorporating ancillary office / staff accommodation including welfare facilities, service yard and loading/unloading area, access off existing service road (under construction), parking, signage, landscaping, lighting, boundary treatments, connection to public sewer, surface water, watermain and utility services and all ancillary and associated works
- RED III - for 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works
for a single storey extension to the main dining room with a retractable roof, a single storey outdoor spa facility consisting of 2 no. ice baths, 2 no. hot tubs, 1 no. sauna pod, a relaxation pod, a changing room pod with toilet facilities and a plant room, signage and all associated site works
for alterations to previously approved Housetype A (3 bedroom +4 bedroom semi detached dwellings), alterations to previously approved Housetype B (3 bedroom Semi Detached dwellings), and alterations to previously approved Housetype C2 (2 bedroom terrace dwellings), comprising of minor alterations to plans & elevations. Retention permission is sought for minor alterations to plans and elevations of Housetype D (6 no. dwellings & 2 no. apartments) Housetype C1 (2 bedroom terrace dwellings) and all ancillary works. The development was previously approved under Pl. Ref. No. 22/336