Annaghlee, Kill, Cootehill
Proposed development
EXTENSION OF DURATION of Planning Reg. No. 15/462; for change of house design from previous grant of permission ref. 15/78 to erect a storey and a half dwelling with attached domestic garage, connection to existing sewerage treatment unit, percolation area and all associated site works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 17 Jun 2021
Timeline
Application received
2 Mar 2021
Council asked for further information
23 Apr 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
21 May 2021
Decision due
17 Jun 2021
Decision: conditional
15 Jun 2021
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
- RED III - for 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works
- RED III - for a 10-year planning permission for the provision of a Battery Energy Storage System and compound on a site of c. 1.27ha to support the adjacent permitted solar farm (CCC Reg. Ref.: 21/510). The Battery Energy Storage System (BESS) compound will accommodate self-contained Lithium Ion Phosphate batteries, within 14 no. BESS units, and 3 no. twin skid units and a single skid unit. A control room (c. 27.6m2) is proposed to the west of the compound. The proposed development includes for all associated development, boundary treatments, security fencing, site access works, ducting and cabling and all associated ancillary works
for a single storey extension to the main dining room with a retractable roof, a single storey outdoor spa facility consisting of 2 no. ice baths, 2 no. hot tubs, 1 no. sauna pod, a relaxation pod, a changing room pod with toilet facilities and a plant room, signage and all associated site works
for A) RETENTION of existing detached storage / manufacturing unit. B) Planning PERMISSION to erect 3 no. detached storage units and all associated works. Works include removal of existing temporary storage facilities. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.
to erect new dwelling house, entrance, boundary walls, piers with sewerage treatment system & percolation area
to amend the approved development (Planning Reference: 16/507) of a temporary (25 years) solar farm to include photovoltaic panels with mounting frames on screw pile foundations, inverters, transformers, substation, DNO building, communications building, security fencing, pole mounted security cameras, minor upgrades to existing site entrance and all other ancillary works. It is expected that the proposed development will have an output of up to 5 megawatts (MW). Amendment proposed is as follows: increase the output from 5 Megawatts (MW) to 7 Megawatts (MW)