Ballinteskin, Wicklow, Co. Wicklow
Proposed development
Construction of a machinery shed within the existing farmyard
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 21 Jun 2026
Timeline
Application received
27 Apr 2026
Decision due
21 Jun 2026
Decision: conditional
18 Jun 2026
Grant issued
21 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for a new dwelling, new entrance onto public road, wastewater treatment unit and soil polishing filter, new well and associated works
attic conversion consisting of 2 no bedrooms bath room and storage/study area. 2 no velux roof windows each to front and rear elevations 2 no gable windows one at each end at attic level. conservatory to rear
attic conversion consisting of 2 bedrooms, bathroom and storage study area, 2 no velux roof windows each to front and rear elevations, 2 no gable windows one at each end at attic level conservatory to rear
3 no 3 bed housing units, the construction of a new entrance including a culvert of the stream, and the replacement of the pipes at the existing entrance with a new culvert
3 no 3 bed housing units, the construction of a new entrance including a culvert of the stream and the replacement of the pipes at the existing entrance with a new culvert
reclamation of land through the filling of material comprising clay, silt, sand, gravel or stone on a site having an area of 4.28 hectares for the purpose of improvements of land, together with site access and roadway and other ancillary site works