Mount John, Newcastle, Co. Wicklow
Proposed development
1. a sand arena covered by a shed structure 2. a concrete retaining wall 3. a covered dung stead and associated works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 8 Jun 2026
Timeline
Application received
14 Apr 2026
Decision due
8 Jun 2026
Decision: conditional
2 Jun 2026
Grant issued
7 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for full planning permission for 1. A sand arena covered by a shed structure 2. A concrete retaining wall 3. A covered dung stead and associated works
demolition of existing extension over basement, ground and first floors to rear of dwelling; the construction of replacement rear extension over basement, ground and first floors; and waste treatment system, percolation area and all associated landscaping and site works
creation of a granny flat in part of existing garage and play room, new roof, windows and external wall to existing garage and play room which is to be part converted to a granny flat and associate works
proposed 110 sq.m. extension to side and rear of existing 48 sq.m. cottage, 1.8 sq.m. front porch, domestic garage, new waste water treatment system to EPA standards, and associated works
proposed two storey extension of 190.0sq.m to existing 50.0sq.m cottage, and privy. The development will consist of the following(1) Demolition of privy/coal shed at rear of existing dwelling replace with proposed garage.(2) Convert existing cottage to living area. With a 7.0sq.m rear extension and front porch. (3) Two storey extension to side and rear of existing cottage. Consisting of 4 no. bedrooms, 1 bathroom and 3 ensuites, work from home office. And Utility room.(4) Septic tank and percolation area. ( 5) mains water connection. (6) All associated site works
development consists of the installation of a new effluent treatment system to comply with current EPA requirements