Kilballyowen, Ballinacor South Annacurra, Aughrim
Proposed development
(1) installation of a field access gate at the proposed entrance (2) construction of a concrete slab surface at the entrance, including the provision of an Eco-drain to manage surface water runoff and discharge it to an existing roadside open ditch (3) removal of existing small trees located to the north-west of the proposed field entrance, and their replacement with indigenous tree species, to be planted in a set-back position from the public road in order to maintain natural screening (4) removal of the existing hedgerows on both sides of the proposed field entrance and their replacement with indigenous hedgerows, to be planted set back from the public road tarmac, and also the creation of additional grass verges on both sides of the entrance in order to improve visibility and (5) associated site development works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 17 May 2026
Timeline
Application received
23 Mar 2026
Decision due
17 May 2026
Decision: refused
11 May 2026
Appeal decided: refused (PL-501405-WW-26)
10 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construct 2no. dwellings (semi-detached) with connection to public services, new site entrances, and all associated site works
for new bay window with roof at first floor level on front elevation together with all associated site works
erect an extension to Annacurra GAA Club dressing rooms and the erection of a ball wall to the North West of the existing playing pitch all with associated site works and servcies
extension and alterations to commercial premises (planning ref 16//668)
new bay window with roof at first floor level on front elevation together with a single storey side extension and all ancillary site works
extend the appropriate period of 16/668 - renovations to existing guest accommodation at first floor level to create seven en suite guest bedrooms, new windows at first floor level to side and rear, new Velux windows to front roof, new enclosed fire escape to rear, revised entrance to public road, new waste water treatment system to serve the premises and all ancillary works