Ballyfree East, Glenealy, Co. Wicklow
Proposed development
Plan 8 Architects (www.plan8.ie) are applying, on behalf of our clients Robert & Gosia Freeze, Kerrie & Shane Doyle, Michael & Susan O’Neill, and Ryan Esmonde for Retention Planning Permission for the following: • Retention of Existing front boundary treatments and vehicular entrances. • Retention of Existing side boundary treatments. Planning Permission sought for the following: • Set back roadside boundary of dwelling No. 04. • Provision of new 2m wide roadside setback to allow for the future provision of a public footpath. At Ballyfree East, Glenealy, Co. Wicklow.
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 19 Apr 2026
Timeline
Application received
11 Dec 2025
Council asked for further information
9 Feb 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
23 Mar 2026
Decision due
19 Apr 2026
Decision: conditional
14 Apr 2026
Grant issued
19 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1. 06 No detached dwellings with individual wastewater treatment systems. 2. new access road to serve item 1. 3.alterations to car parking facility previously approved under Pl. Reg. Ref. 24/60369. 4. alterations to access road serving Glenealy Hurling Club previously approved Pl. Reg. Ref. 24/60369. 5. connection to all public services together with all associated ancillary works to facilitate the above
3 number chalets as constructed and permission for proposed 3 new individual connections to mains water, permission for proposed 2 number effluent treatment systems to current EPA standards to serve these 3 chalets, permission for improvements to sightlines at main entrance and associated site works for use as tourist accommodation accessed off existing private lane
3 number chalets as constructed proposed 3 new individual connections to mains water, proposed 2 number effluent treatment systems to current EPA standards to serve these 3 chalets, improvements to sightlines at main entrance and associated site works for use as tourist accommodation accessed off existing private lane
installation of an air-to-water heat pump system, including external heat pump unit(s) and enclosure, the installation of an LPG storage tank and enclosure, and all related underground pipework and associated site works
installation of an air-to-water heat pump system, including external heat pump unit(s) and enclosure, the installation of an LPG storage tank and enclosure, and all related underground pipework and associated site works
landscaped Remembrance Garden, incorporating the installation of above-ground prefabricated Columbarium Walls for the storage of cremation urns, the provision of pedestrian access gate, repair of existing stone boundary wall, new boundary hedging to the L1096 (Ashford Road), and the importation of topsoil to facilitate site levelling and pocket landscaping, all together with associated site development works.