Roddenagh, Aughrim, Co. Wicklow
Proposed development
Construction of a new dwelling, new access, installation of a wastewater treatment system and percolation area, new well and all associated site works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 19 Aug 2025
Timeline
Application received
25 Jun 2025
Decision due
19 Aug 2025
Decision: refused
15 Aug 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County Wicklow, the proposed grid connection will be installed within existing private tracks and public roadway and include, provision of joint bays, draw pits, communication chambers, three phase electrical cables, optical fibre cables and cable sheath sectionalising chambers, water and rail crossings by (i) bridge crossings, (ii) horizontal directional drilling and iii) guided auger bore, limited ancillary forestry felling to facilitate construction and operation of the proposed development, reinstatement of land, road and track surface above the proposed cabling trench, all associated ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended, When a notice issues in accordence with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
1. retention permission for as constructed dwelling 2. retention permission for garage 3. retention permission for revised site boundaries 4. permission for extension to the side of existing dwelling 5. permission for relocation of 2no roof lights on the rear roof plane
for as constructed dwelling
as constructed dwelling
dwelling, garage, well, effluent treatment system, new entrance and associated works
and completion of domestic garage / store to rear of dwelling and associated works