Westaston Demesne, Kilbride, Co. Wicklow
Proposed development
Construction of a new dwelling, garage, wastewater treatment unit and soil polishing filter, new well, upgrading existing entrance onto public road and associate works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 12 Aug 2025
Timeline
Application received
18 Jun 2025
Decision due
12 Aug 2025
Decision: conditional
6 Aug 2025
Grant issued
10 Sept 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a new dwelling, garage, wastewater treatment unit and soil polishing filter, new well, upgrading existing entrance onto public road and associate works
the construction of a new dwelling, garage, wastewater treatment unit and soil polishing filter, new well, upgrading existing entrance onto public road and associate works
the development at Kilmacurragh House (A Protected Structure) will consist of: The stabilisation and restoration of the building exterior including; reinstatement of the natural slate roof to the Original House and South Wing, replacement roof to Kitchen Wing. Repairs and minor works to the Bull Nose Wing roof. Reinstatement and structural repairs to external and internal walls. Repair and reinstatement of external rough cast render to all facades. Repair to existing solid floor finishes at ground floor and basement level where present and reinstatement of floor structures at first floor level. Repair of existing external joinery and reinstatement of external joinery where it is beyond repair or missing. Installation of 3 new internal stairs. External works; including removal of 20th century concrete material, repair to stone front steps and rear light well, reinstatement of the historic carriage sweep
proposed bungalow and effluent treatment system in accordance with EPA 2021 and associated site works
proposed bungalow and effluent treatment system in accordance with EPA 2021 and associated site works
proposed bungalow and effluent treatment system in accordance with EPA 2022 and associated site works