Knockrobin Farm, Rathnew, Co. Wicklow
Proposed development
New dwelling house, driveway, packaged effluent disposal system with Biofilter direct discharge polishing filter to current EPA standards, new groundwater well, together with all required site and development works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 20 Nov 2025
Timeline
Application received
28 May 2025
Decision due
20 Nov 2025
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
section 42 - extension of appropriate period - 19/138 - 74 no dwelling units, to be accessed from an existing exit / entrance off Hawkstown Road, Burkeen. The application consists of the following: 3 no detached split level 5 beds, 1 no detached 4 bed, 12 no semi detached 4 bed, 12 no semi detached 4 beds, 8 no semi detached 3 beds, 12 no end of terrace 3 beds, 18 no mid terrace 3 beds, 2 no semi detached 2 beds, 8 no mid terrace 2 bed, 4 no end of terrace 1 bed units (ground floor), 4 no end of terrace 1 bed units (first floor), a realignment of previously approved Reg Ref 17/1470 cycle and walkway route, together with required foul and surface water connections, attenuation tank and all site works
new housing development consisting of 22 No. dwellings units at this site The Nursery, Bollarney North, Wicklow Town, Co Wicklow. The proposed development consists in four terraced blocks all together totalling 22 units, containing 3 No. four-bedroom houses, 3 No. three-bedroom houses, 4 No. two-bedroom houses, and 2 No. terraced duplex blocks containing a total of 6 No. two-bedroom ground-floor apartments and 6 No. three-bedroom upper level dwelling units. Closure of an existing commercial exit/entrance with the vehicular/pedestrian access from the R750 Dublin Road via existing Bollarney Woods access granted planning under Condition 9(b) Reg Ref 16/1116. Works also include demolition of all existing glasshouses and shed structures. A reinstatement of watercourse catchment area and a clear span stream crossing and will include a build-up of ground level over the crossing to facilitate the internal vehicular/pedestrian route. New connections to all mains and utility services and all together with associated site development works.
extension and alterations to an existing 100.25m2 dwelling. The works will include: 1. A proposed new 112m2 ground floor extension to the side and rear of existing dwelling to include new entrance and living/ancillary spaces. 2. Alterations to existing plans and elevations to accommodate new proposals to existing dwelling layout. 3. All associated siteworks and landscaping
new dwelling house, driveway, packaged effluent disposal system with Biofilter direct discharge polishing filter to current EPA standards, new groundwater well, together with all required site and development works
new dwelling house, driveway, packaged effluent disposal system with Biofilter direct discharge polishing filter to current EPA standards, new groundwater well, together with all required site and development works
5 bell tent glamping sites each of which are on timber bases together with additional timber panel glamping unit, additional 4 washroom pods connected to public sewer system, communal kitchen, store, open communal area, additional car parking, and all necessary ancillary works and services to facilitate the development