ObjectRight
Back to search
25279Grantedextension of duration

Tober Upper, Dunlavin, Co. Wicklow

Not open for objections: This type of application (extension of duration) doesn't take public submissions.

Proposed development

Section 42 extension of appropriate period - 20/1101 - construct a dwelling house, secondary sewerage treatment system and percolation area, domestic garage, new entrance, alterations to roadside boundary fence and all associated site works

Applicant
Not published
Authority
Wicklow County Council
Decision due
16 Nov 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    22 Sept 2025

  2. Decision due

    16 Nov 2025

  3. Decision: unconditional

    10 Nov 2025

Loading map…

Site location with nearby applications

Can't object to this one

This type of application (extension of duration) doesn't take public submissions.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660574Refused

the importation, processing, recovery and recycling of construction and demolition materials including soil, stone and concrete to produce recycled aggregates, the applicant also seeks to import soil and stone for deposition over an area of 0.93 hectares and raising the ground level approximately 1 m, the annual tonnage proposed for acceptance at the site shall not exceed 25,000 tonnes per annum, a waste facility permit will be applied for to Wicklow County Council.-Install and operate an integrated crusher, screener and washer, quarantine/waste inspection bay, and portable office and welfare facilities -decommission an existing well and install a groundwater abstraction well adjacent to the crusher and screener -continue use of the existing weighbridge and weighbridge cabin, wheel wash, internal haul roads, and security fencing and security gate -egress/exit the site via the existing private access road -additional storage area for recycled C&D materials within a designated part of the site

Sandyhills, Dunlavin, Co. Wicklow Wicklow County Council Received 24 Jun 2026
2660455Awaiting decision

the importation, processing, recovery and recycling of construction and demolition materials including soil, stone and concrete to produce recycled aggregates. The applicant also seeks to import soil and stone for deposition over an area of 0.93 hectares and raising the ground level approximately 1 m. the annual tonnage proposed for acceptance at the site shall not exceed 25,000 tonnes per annum. A waste facility permit will be applied for to Wicklow County Council -install and operate an integrated crusher, screener and washer, quarantine/waste inspection bay, and portable office and welfare facilities -decommission an existing well and install a groundwater abstraction well adjacent to the crusher and screener -continue use of the existing weighbridge and weighbridge cabin, wheel wash, internal haul roads, and security fencing and security gate -egress/exit the site via the existing private access road -additional storage area for recycled C&D materials within a designated part of the site.

Sandyhills, Dunlavin, Co. Wicklow Wicklow County Council Received 22 May 2026
2660422Awaiting decision

consists of the importation, processing, recovery and recycling of construction and demolition materials (C&D) including soil, stone and concrete to produce recycled aggregates. The applicant also seeks to import clean, uncontaminated soil and stone for deposition over an area of 0.93 hectares

Sandyhills, Dunlavin, Co. Wicklow Wicklow County Council Received 15 May 2026
2660169Awaiting decision

phased extension to the existing quarry, measuring c. 14.13 hectares, located to the south/south-east of the existing extraction area, to be excavated to final floor levels ranging from approximately 202.7 m OD at the north-western extent of the extension area to approximately 227.7 m OD at the south-eastern extent of the extension area (as shown on the application drawings) and the extraction of approximately 150,000 tonnes per annum (being the maximum total output from the quarry as a whole) of sand, gravel and stone using mechanical means only. The development will also consist of: the provision of an additional wash plant (to supplement the existing wash plant); drainage infrastructure; fencing; boundary treatments (including berms and tree planting and the importation of geochemically suitable inert soil material, where required, to support berm construction); internal roads and access/haul routes; and all associated site works. (The proposed extension will operate using the existing permitted access to the R756, together with the existing internal haul road and all previously permitted processing and ancillary facilities, including: sand storage and testing lab shed, wash plant, water recycling system, sludge storage bay, water storage tank, wheelwash, well, pumphouse, temporary portacabin office, canteen, portaloo, berms, and mobile screening plant). The proposed extension of the existing quarry will operate for a period of 10 years from commencement of extraction within the extension area, after which an approved restoration and remediation plan will be implemented. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development will be submitted to the Planning Authority with the application

Tober Upper, Dunlavin, Co. Wicklow Wicklow County Council Received 10 Mar 2026
2660114Awaiting decision

phased extension to the existing quarry, measuring c. 14.13 hectares, located to the south/south-east of the existing extraction area, to be excavated to final floor levels ranging from approximately 202.7 m OD at the north-western extent of the extension area to approximately 227.7 m OD at the south-eastern extent of the extension area (as shown on the application drawings) and the extraction of approximately 150,000 tonnes per annum (being the maximum total output from the quarry as a whole) of sand, gravel and stone using mechanical means only. The development will also consist of: the provision of an additional wash plant (to supplement the existing wash plant); drainage infrastructure; fencing; boundary treatments (including berms and tree planting and the importation of geochemically suitable inert soil material, where required, to support berm construction); internal roads and access/haul routes; and all associated site works. (The proposed extension will operate using the existing permitted access to the R756, together with the existing internal haul road and all previously permitted processing and ancillary facilities, including: sand storage and testing lab shed, wash plant, water recycling system, sludge storage bay, water storage tank, wheelwash, well, pumphouse, temporary portacabin office, canteen, portaloo, berms, and mobile screening plant.) The proposed extension of the existing quarry will operate for a period of 10 years from commencement of extraction within the extension area, after which an approved restoration and remediation plan will be implemented. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development will be submitted to the Planning Authority with the application

Tober Upper, Dunlavin, Co. Wicklow Wicklow County Council Received 18 Feb 2026
22951Granted

revised site layout plan to Planning Application Reference number 20/1101 (planning permission for dwelling house, secondary sewerage treatment system and percolation area, domestic garage, new entrance, alterations to roadside boundary fence and all associated site works). The revisions refer to a new finished floor level to the dwelling house and domestic garage

Tober Upper, Dunlavin, Co. Wicklow Wicklow County Council Received 26 Aug 2022