Homerville, Shelton, Shelton Abbey
Proposed development
1) existing garage, plant rooms and first floor pigeon loft. 2) retention of part built single storey vintage car storage building and permission to complete same with a low pitched roof. 3) all associated site works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- Not available
Timeline
Application received
25 Jul 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
of part built single story vintage car storage building and permission to complete same with a low pitched green roof, and all associated site works
the following works to connect Avoca River Park to public services: • an underground foul pump station and an above ground kiosk with a total height of 1.8m within a secure compound located on lands at Avoca River Park; • a watermain with a total length of c. 2.2km and a foul rising main with a total length of c. 2.2km from the proposed pump station, traversing lands within Avoca River Park, the existing trackway through the marsh, 10 and 11 Ferrybank and terminating in the public road (R772); • installation of fibre connections with a total length of c. 2.2km with fibre ducts; • connection to the existing Uisce Éireann foul network and watermain network; • all associated site development works above and below ground
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
existing garage and boiler house and solid a fuel storage and first floor pigeon loft. Retention of part built single storey vintage car storage building and permission to complete same with a low-pitched roof and all associated site works
erect a dwelling and garage with services along with all associated site development works
1) existing garage, plant rooms and first floor pigeon loft. 2) retention of part built single storey vintage car storage building and permission to complete same with a low pitched roof. 3) all associated site works