Ballinabarny North, Redcross, Co. Wicklow
Proposed development
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- Not available
Timeline
Application received
6 Dec 2023
Council asked for further information
7 Feb 2024
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
5 Apr 2024
Decision due
Not available
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
agricultural entrance and all associated site works
construction of a new single storey detached dwelling, with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works at a site
the construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto existing entrance of laneway which leads to the public road, upgrading existing entrance onto public road and associate works
the construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto existing entrance of laneway which leads to the public road, upgrading existing entrance onto public road and associate works
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
the importation of material to in-fill and re-contour the subject site at Ballinabarny South, Redcross, Wicklow. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243tonnes to fill Phase 2, 28,596tonnes to fill Phase 3, and 28,596 to fill Phase 4, equating to a total of 123,987 tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit