Seabank, Arklow, Co. Wicklow
Proposed development
Erection of a front porch, replace existing flat roof on rear of existing dwelling with pitched roof married into existing pitched roof by raising the height of the existing pitched roof by 800mm, to remove existing chimneys, install a solar panel on the new south facing roof, and to replace existing flat roof on existing shed/domestic garage to rear of existing dwelling with a pitched roof, together with all associated site works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 7 Jan 2023
Timeline
Application received
4 Nov 2022
Decision due
7 Jan 2023
Decision: conditional
16 Dec 2022
Grant issued
31 Jan 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
erection of a front porch, replace existing flat roof on rear of existing dwelling with pitched roof married into existing pitched roof by raising the height of the existing pitched roof by 800mm, to remove existing chimneys, install a solar panel on the new south facing roof, and to replace existing flat roof on existing shed/domestic garage to rear of existing dwelling with a pitched roof, together with all associated site works
single storey dwelling and domestic garage with a waste water treatment unit and percolation area to current EPA specifications, plus bored well, together with all associated site works
alterations and additions. The proposed works comprise of the demolition of existing front entrance porch and single storey conservatory structure to the side and rear of the existing dwelling, the demolition of an existing detached single storey garage structure to rear, the construction of a new single storey master bedroom extension to gable end, the construction of a new single storey kitchen / utility, dining and living room extension to rear, the relocation of main entrance door from the front to the side of the dwelling, alterations to existing window openings, and all associated site works, to include the construction of a new on site waste water treatment facility to current EPA standards and modifications to existing site entrance