Oldboleys, Glencree, Co. Wicklow
Proposed development
The construction of a small-scale hydroelectric scheme on the Glencree River. The scheme is to include an intake channel comprising a Coanda screen with bypass notch and fish pass, penstock pipe 380m long and 560mm diameter, turbine house, tailrace discharge and all associated electrical and site works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 12 Jul 2021
Timeline
Application received
18 May 2021
Decision due
12 Jul 2021
Decision: conditional
8 Jul 2021
Grant issued
19 Aug 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
7 x 8 metre wooden cabin
installation of 28 no. ground mounted solar panels. The total area of proposed PV panel array is 60 sqm.
changes to the previously approved planning reg. ref No. 21/1556. The construction of a north facing single-storey extension (42sqm). Increase the existing ridge height on the existing bungalow by 1.375m and convert part of the attic space into a habitable room. Extend the floor area of the approved south facing extension by 77.2sqm to the rear. Revise the south and west facing elevations to include extended patio deck, timber shutters, timber handrail and extended roof overhang. The approved south facing extension lower floor level to match the existing floor level of the Bungalow, with associated ancillary site development and drainage works
the construction of a south facing two storey extension (203sqm) at raised ground floor and basement level and internal alterations to the existing Bungalow, alterations to the entrance. New waste water treatment plant and raised bed percolation area, rain water harvesting system with associated ancillary site development and drainage works
detached single storey three bedroom dwelling with part mezzanine living room, all associated site development works, drainage, driveway, access and landscaping to accommodate new dwelling, new wastewater treatment system and percolation area to current EPA standards along with bored well and a surface water soakaway to meet BRE 365 standards