Ballinaskea, Arklow, Co Wicklow
Proposed development
Of an existing telecommunications support structure (previously granted under Plan Ref No 07/374) together with associated ground equipment cabinets within a fenced compound
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 24 May 2021
Timeline
Application received
30 Mar 2021
Decision due
24 May 2021
Decision: conditional
19 May 2021
Grant issued
30 Jun 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
RED III - Level 3 - (1) installation of a 227 sqm domestic ground-mounted solar photovoltaic (PV) panel system on steel support frames (2) erection of a domestic battery energy storage enclosure shed (3) all associated underground electrical cabling and PVC ducting (4) installation of the new site access gates with a gravel-surfaced front apron and additional wire boundary fencing (5) the removal of an existing Laurel hedge located to the north of the existing field entrance, and its replacement with a new Laurel hedge planted in a set-back position from the public road tarmac to maintain natural screening (6) the creation of an additional grass verge width to the north of the existing field entrance to improve visibility lines; and (7) all associated site development, drainage, and landscaping works
RED III - (1) installation of a 227 sqm domestic ground-mounted solar photovoltaic (PV) panel system on steel support frames (2) erection of a domestic battery energy storage enclosure shed (3) all associated underground electrical cabling and PVC ducting (4) installation of the new site access gates with a gravel-surfaced front apron and additional wire boundary fencing (5) the removal of an existing Laurel hedge located to the north of the existing field entrance, and its replacement with a new Laurel hedge planted in a set-back position from the public road tarmac to maintain natural screening (6) the creation of an additional grass verge width to the north of the existing field entrance to improve visibility lines; and (7) all associated site development, drainage, and landscaping works
demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works
construction of a 24 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment, fencing and all associated site development works. the development will continue to form part of existing 3G and 4G Broadband network
demolition of existing storage shed, a new shed to serve as house ancillary storage and hobby shed to store vintage cars and associated site development works
porch to side of dwelling, garage to rear of dwelling and connect to existing services and all associated site works