Johnstown South, Arklow, Co. W icklow
Proposed development
Construction of a bungalow with garage and car port, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works
- Applicant
- Not published
- Authority
- Wicklow County Council
- Decision due
- 8 Mar 2022
- Residential units
- 1
- Floor area
- 209 m²
Timeline
Application received
5 Nov 2021
Council asked for further information
20 Dec 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
9 Feb 2022
Decision due
8 Mar 2022
Decision: conditional
4 Mar 2022
Grant issued
7 Apr 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application
construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works
the construction of a bungalow with garage, a new entrance, a new treatment system and percolation area to current EPA standards and all ancillary site works
a 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow
solar farm within a site area of approximately 39 hectares consisting of solar photovoltaic panels covering an area of up to 27.2 ha on ground mounted steel frames, 1 no on site substation, 8 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years