ObjectRight
Back to search
17890Awaiting decisionpermission

Threecastles, Blessington, Co. Wicklow

Not open for objections: The council has marked this application invalid or closed.

Proposed development

Solar PV panel array comprising photovoltaic panels on ground mounted frames within a site area of 21.04 ha, 8 no single storey MV substations, 1 no single storey DSO substation, 1 no single storey customer substation with 1 no communications pole attached, 1 no single storey spares building, boundary securing fencing and access gates, CCTV, associated electrical cabling and ducting, upgraded and new access tracks and all associated ancillary development and landscaping works. The planning application includes a Natura Impact Statement

Applicant
Not published
Authority
Wicklow County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    20 Jul 2017

  2. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The council has marked this application invalid or closed.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2560539Granted

construction of two storey dwelling with a treatment plant, soil polishing filter and a new entrance along with all associated site works

Threecastles, Blessington, Co. Wicklow Wicklow County Council Received 16 Jul 2025
2460257Granted

permission for a period of 10 years to construct and complete a solar PV energy development and grid route, with a total site area of 28 hectares comprising of the construction of PV panels mounted on metal frames, transformer stations, new access tracks, perimeter fencing with CCTV cameras and access gates, temporary construction compounds, 20 kV underground cabling connecting the solar farm to the existing Blessington 38kV ESB Substation, and all ancillary grid infrastructure and associated works. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of the application for planning permission

Townlands of Threecastles Crosscoolharbour Santryhill Newpaddocks Oldpaddocks and Edmonstown, Blessington, County Wicklow Wicklow County Council Received 8 May 2024
2460186Awaiting decision

permission for a period of 10 years to construct and complete a solar PV energy development and grid route, with a total site area of 28 hectares comprising of the construction of PV panels mounted on metal frames, transformer stations, new access tracks, perimeter fencing with CCTV cameras and access gates, temporary construction compounds, 20 kV underground cabling connecting the solar farm to the existing Blessington 38kV ESB Substation, and all ancillary grid infrastructure and associated works. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of the application for planning permission

Townlands of Threecastles Crosscoolharbour Santryhill Newpaddocks Oldpaddocks and Edmonstown, Blessington, County Wicklow Wicklow County Council Received 28 Mar 2024
23690Refused

of PRR 17/908 and PRR 21/1237

Blessington, Co. Wicklow Wicklow County Council Received 5 Sept 2023
211237Granted

amend the design of the approved development (Planning Reference 17/908) which comprises consent for a Solar PV Energy Development. Proposed amendments include (1) Project lifetime proposed to be extended from 30 years to 35 years (2) Substation to increase in size (3)Change in height and angle of solar panels (4) Transformer containers to increase in size (5) Removal of the customer substation (6) Deer fencing to increase in size (7) MW output to be increased from 10.8 to 15MW to align with existing grid connection offer (8) Slight alteration to the access tracks and (9) Number of CCTV cameras to reduce

Threecastles, Blessington, Co Wicklow Wicklow County Council Received 14 Oct 2021
17908Granted

solar PV panel array comprising photovoltaic panels on ground mounted frames within a site area of 21.04 ha, 8 no single storey MV substations, 1 no single storey DSO substation, 1 no single storey customer substation with 1 no communications pole attached, 1 no single storey spares building, boundary securing fencing and access gates, CCTV, associated electrical cabling and ducting, upgraded and new access tracks and all associated ancillary development and landscaping works. The planning application includes a Natura Impact Statement

Threecastles, Blessington, Co. Wicklow Wicklow County Council Received 26 Jul 2017