Newdown, The Downs, Mullingar
Proposed development
Construction and relocation of a previously approved agricultural shed (Planning Ref. 20/6317), to be constructed on the northern portion of the site instead of the originally approved location. Permission is also sought for the demolition of an existing agricultural shed measuring 152 sq.m and its replacement with a new agricultural shed measuring 459.2 sq.m, to be constructed on the footprint of the demolished structure located to the east of the site, together with all associated ancillary site development works
- Applicant
- Not published
- Authority
- Westmeath County Council
- Decision due
- 15 Nov 2026
Timeline
Application received
23 Jun 2026
Last day for public submissions (est.)
Mon 27 Jul 2026
Council asked for further information
17 Aug 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
19 Oct 2026
Decision due
15 Nov 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
RED III planning permission for a period of 10 years for development on a site of 4.63 hectares within the “Flynn Renewable Energy Park”. The proposed development is a “renewable energy development” for the purposes of the Renewable Energy Directive III and will consist of: i. Buildings and Associated Structures: administration building (395sq.m GFA and approx. 5.4m high (h); main process building (5,573sq.m GFA and approx. 14.74m-15.3m h) and an attached biofilter building (1,066sq.m GFA and approx. 9.9m h) with odour control system and associated emission stack 30m h; and a control building (22sq.m GFA and approx. 4.4m h). ii. Bunded Tank Farm: including 4 no. digester tanks and a digestate storage tank (each approx. 17m h); a sludge buffer tank (approx. 12m h); 3 no. liquid feedstock tanks (approx. 12.6-13.8m h), a desulphurisation unit (approx. 14m h) and 4 no. lightning rods (23m h). iii. Associated Plant: a carbon dioxide (CO2) liquefaction plant (approx. 11.5m h); a biogas upgrade plant (approx. 6.41m h); 4 no. fan coolers (approx. 2.2m h); 2 no. enclosed combined heat and power (CHP) units (approx. 7.5m h), an enclosed boiler unit (approx. 5.44m h) with a shared stack 30m h; a gas flare stack unit (approx. 10.1m h); a fuel storage tank (approx. 1.83m h); a gas grid entry unit (approx. 5.1m h); a firewater tank (approx. 10.1m h); 3 no. liquefied petroleum gas (LPG) storage (propane) tanks (approx. 3.8m h); and a backup generator (approx. 2.6m h). iv. Provision of 21 car parking spaces (including 2 EV charging spaces and 2 accessible parking spaces), 2 motorcycle parking spaces and a covered bicycle store providing 5 no. bicycle parking spaces. v. Upgrading and widening to approx. 7.0m width of the existing access road together with works to improve visibility sightlines at the existing junction with R156 Road. vi. All ancillary site development works and services, including connection to water supply, security gates, a freshwater storage tank (approx. 5.1m overall h), a wheel wash, two weighbridges, landscaping, boundary fencing, 2 no. headwalls with associated pipework for extension of the existing surface water culvert drainage to accommodate the access lane, site lighting, surface water drainage and underground attenuation tanks, a foul effluent collection system, one entrance sign and one directional sign, a service yard, internal circulation routes, pipe bridges, access stairs and footpaths and all associated site development and i
construction of a new part single storey/ part two storey type dwelling house, domestic garage, new vehicular entrance, proprietary wastewater treatment system and raised soil polishing filter and all associated ancillary site services
development which will consist of the construction of a Generator Compound, including the installation of three generator units with associated transformers, concrete plinths, an ESB room (45 sq.m), and fencing, along with associated infrastructure and all necessary ancillary site works
development which will consist of the construction of a Generator Compound, including the installation of three generator units with associated transformers, concrete plinths, an ESB room (45 sq.m), and fencing, along with associated infrastructure and all necessary ancillary site works
proposed development which will consist of the installation of a forecourt canopy above the existing pump islands with associated signage and the installation of an underground fuel tank
development which will consist of planning permission to construct new roof dungstead, concrete apron and ancillary site works