Windmill, Milltownpass, Mullingar
Proposed development
Extension of Duration to construct a dwelling house with treatment system & percolation area with ancillary works
- Applicant
- Not published
- Authority
- Westmeath County Council
- Decision due
- 25 Mar 2026
Timeline
Application received
29 Jan 2026
Decision due
25 Mar 2026
Decision: conditional
25 Mar 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
development which will consist of the demolition of an existing 2-storey rear extension and single-storey shed, and the construction of a part single-storey part 2-storey extension to the side and rear of the existing dwelling, a new upgraded waste water treatment system and all associated and ancillary site works
extension to existing dwelling at front to include a living and dining area with two velux windows and at the rear an en-suite and wardrobe and two velux windows with all ancillary site works
RETENTION permission is sought for a two-storey domestic garage with a Ground Floor Area of 65.7 sq.m. and a First Floor Area of 65.7 sq.m. (total of 131.4 sq.m) together with all associated ancillary site development and site works
This application is seeking a 10-year permission. The development will consist of: (1) Provision of Constructed Wetland (CW) type Wastewater Treatment Plant (WWTP) for the treatment of wastewater from the Millview Housing Estate comprising 1 no. septic tank and 3 no. CW ponds; (2) Decommission of the existing Millview WWTP; (3) Provision of a new terminal Wastewater Pumping Station (WWPS) and stormwater management at the site adjacent to the existing Millview WWTP; (4) Construction of maintenance road surrounding the CW ponds and connecting the existing and proposed WWTPs; (5) Installation of a ground-mounted solar photovoltaic (PV) array; (6) Ancillary works associated with the development including the associated pipework, fencing, and landscaping. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
permission consequent on the grant of outline planning reference 22/15, permission consequent for a new dwelling house and detached garage, new site entrance, boundary and landscaping treatment, new secondary treatment system with polishing filter and ancillary site works as per condition no.2 of the outline permission granted
development that will consist of: (1) Provision of Constructed Wetland (CW) type Wastewater Treatment Plant (WWTP) for the treatment of wastewater from the Millview Housing Estate comprising 1 no. septic tank and 3 no. CW ponds; (2) Decommission of the existing Millview WWTP; (3) Provision of a new terminal Wastewater Pumping Station (WWPS) and stormwater management at the site adjacent to the existing Millview WWTP; (4) Construction of maintenance road surrounding the CW ponds and connecting the existing and proposed WWTPs; (5) Installation of a ground-mounted solar photovoltaic (PV) array; (6) Ancillary works associated with the development including the associated pipework, fencing, and landscaping. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application. This application is seeking a 10-year permission.