TEG Head Office, Forest Park Mullingar, Co. Westmeath
Proposed development
For a development which will consist of proposed mezzanine level to existing manufacturing /industrial unit and associated works
- Applicant
- Not published
- Authority
- Westmeath County Council
- Decision due
- 11 Aug 2025
Timeline
Application received
17 Jun 2025
Decision due
11 Aug 2025
Decision: conditional
5 Aug 2025
Grant issued
10 Sept 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
development which will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560104 for which no works have commenced. The development incorporates elements previously granted permission, including: a) Change of use of the existing decommissioned oil tank storage area (43.06 m2) to the northern elevation of the main building into staff facilities along with the construction of a link structure (46.55 m2) between the main building and existing decommissioned oil tank storage area, along with all associated elevational changes, including demolition of decommissioned chimney from oil boiler. b) The removal of existing water storage tank to the southern elevation. c) The rendering of the existing lower section of the elevations to match the proposed extension finishes, with new cladding to the south, west and north elevations, with remaining existing cladding painted. d) The installation of a perimeter mesh fencing with the provision of additional parking and relocated new truck only entrance from the existing estate road. In addition, the following works are proposed: e) Construction of a 901.02 m2 extension to the northern elevation to allow for the expansion of the existing production area, together with the demolition/removal of the existing compressor room, storage area and a shed (245.11 m2), relocation of the existing compressor room along with all associated elevational changes. f) Enlargement of the existing plant area-chiller compound, removal of existing fence and installation of new fencing, together with the relocation of associated pipework and required technical equipment. g) Provision of two new access doors into the north extension, relocation of the internal stair access door and a minor elevational alteration to include a new door opening into the existing plant area-chiller compound. h) Construction of 8 no. additional silos to the southern elevation adjacent to the 4 no. existing silos, including all associated structural works, service connections, removal of existing fencing and installation of replacement fencing. i) All ancillary site works, and all works above and below ground to accommodate the above works.
retention permission for replacement of garage door with window to front of existing dwelling and ancillary site works
EXTENSION of DURATION for development consisting of the following works, warehouse and process hall with offices and welfare facilities (circa 1895 sq m) new road entrance, 2 no dock levellers to north facing elevation, new concrete yard, staff and visitor parking with all associated site works
RETENTION permission for replacement of garage door with window to front of existing dwelling and ancillary site works
The development consists of RETENTION of and Permission to complete partially constructed, 4nr two storey houses, 19nr duplex units, 5 nr bin stores, creche and community buildings (both shell and core) (previous ref 19/6159)
RETENTION for the completion of partially completed buildings: 4nr two storey houses, 19nr duplex units, 5nr bin stores, Creche and Community Buildings (both shell and core) (Previous Permission ref 19/6159)