No.7 Saint Asicus Villas, Athlone, Co. Westmeath
Proposed development
Construction of a two storey extension onto the rear of our dwelling house including internal renovations and all associated site works
- Applicant
- Not published
- Authority
- Westmeath County Council
- Decision due
- Not available
Timeline
Application received
14 Mar 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
RETENTION Planning Permission to retain as constructed extension to existing bedroom to the rear of my dwelling at first floor level and all associated site works
development which consists of a CHANGE OF USE from a Beauty Salon with its rear garden to a Two Bedroom Apartment with rear garden
RETENTION of rear 2 storey extension, consisting of ground floor Store, first floor cold room / kitchen and goods access stairwell
Retention for a lightweight Structure enclosing 3 No Paddle courts with an entrance lobby. The development islocated and delineated within the existing Site and at the eastern end of the Planet Athlone Bowling and leisure centre, replacing existing 5 A side Astra turf and its 2M enclosing fence. The development includes site works to existing structure, including interalia: Storm water drainage disposal
Retention Permission for a lightweight Structure enclosing 3 No Paddle courts with an entrance lobby. The development is located and delineated within the existing Site and at the eastern end of the Planet Athlone Bowling and leisure centre, replacing existing 5 A side Astra turf and its 2M enclosing fence. The development includes site works to existing structure, including inter alia: Storm water drainage disposal
upgrades to the existing Athlone Water Treatment Plant located in the townland of Athlone, Co. Westmeath. The proposed development consists of the following works: Above Ground Coagulation and Flocculation Tank; 3 No. Below Ground Wash Water Settlement Tanks; 1 No. Below Ground Acid Dosing Static Mixer Chamber; 1 No. Below Ground Polymer Dosing Static Mixer Chamber; 4 No. Below Ground Chemical Spill Collection Tanks with Valve Chambers; Welfare Building; Chemical Storage Building-2; Chemical Storage-1 and MCC Building; UV and BW Pumps Kiosk; Extension of Existing ESB Substation Building; Store Room; MCC-2 and Polymer Dosing kiosk; Supernatant Pump Sump and Valve Chamber; High Lift Pump Sump; Modifications to the Clear Water Tank to provide for UV- BW Pumps Kiosk, Backwash Tank, Disinfection, Conditioning Mixing Chambers and Clear Water Tank; Installation Roof Mounted Solar PV Panels; Existing gantry walkway will be upgraded; New intake screen will be installed along with an automatic cleaning system; New suction piping will be fitted; The existing raw water pumps will be upgraded to meet increased capacity and performance requirements; Demolition and Removal of Existing Buildings / Facilities, Including: a) Chemicals Storage Building b) Chlorine Tank Kiosk c) Sulphuric Acid Dosing Kiosk e) Fluorine Tank Kiosk f) Storage Container g) Centrifuge Kiosk h) Dewatering Kiosk i) Sludge Holding Tank j) 2 No. Sludge Thickeners k) Existing pipework and intake screens located in the river l) Existing submersible pumps and associated piping; Landscaping; All associated site development and excavation works above and below ground; Associated temporary development works, including a temporary compound area and temporary access for the construction period. Proposed works are within the curtilage of a protected structure RPS 095 NIAH number 15004120. A Natura Impact Statement will be submitted to the planning authority with the application.