40 St Ursulas Terrace, Ballytruckle Road, Waterford
Proposed development
Two storey extension & single storey sunroom to rear of existing dwelling
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 16 Aug 2026
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
22 Jun 2026
Decision due
16 Aug 2026
Decision: conditional
13 Aug 2026
Grant issued
18 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
by Michelle Doyle for the conversion of existing building to a 3 bedroom 2 storey dwelling, together with all other associated site works
a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, a heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and a district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
for material alterations to as Granted Planning Application 23/60288 (ABP-3200361-24) at existing Sinnotts property which occupies nos. 1, 2 & 3 Manor Street and nos. 27 - 31 John Street and rear of 31A and 32 John Street, Waterford, namely for the construction of an additional floor at 1-3 Manor Street, Waterford and the change of use of previously granted roof space at 27-28 John Street, Waterford, with the addition of dormer windows to provide an additional 2no student apartments of 6 beds and 3 beds with associated common rooms, all with associated site development works
Alterations and extension, comprising new entrance porch, new rear extension, new first floor dormer accommodation, 3 no. new rear dormer windows and 3 no. new roof windows at front elevation and all associated siteworks
the demolition of an existing vacant two-storey dwelling house and the subdivision of the site into four residential sites, together with all associated site works,
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.