Crobally Lower, Tramore, Co.Waterford
Proposed development
The Refurbishment of an existing Cottage with the addition of an entrance Porch to the rear and to connect to the Public Sewer Network and all associated site works
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 23 Nov 2026
Timeline
Application received
29 Sept 2026
Last day for public submissions (est.)
Mon 2 Nov 2026
Decision due
23 Nov 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Installation of a new booster pumping station and all associated assets below: • Concrete plinth and above ground kiosk (approx.. 4.6m x 2.6m x 2.1m) • Underground Pipework to connect to existing network • All ancillary development and site works • Associated below ground pipework, fittings and chambers • ESB meter cabinet
Installation of a new booster pumping station and all associated assets below:• Concrete plinth and above ground kiosk (approx.. 4.6m x 2.6m x 2.1m)• Underground Pipework to connect to existing network• All ancillary development and site works •Associated below ground pipework, fittings and chambers• ESB meter cabinet
for the Construction of a 1200mm high Ball Stop Fencing to surround of pitch Areas, To install Dugouts, Install Terrace Barrier to top of existing Dwarf Wall, Install associated Astro Areas and all associated Site Works.
installation of a new booster pumping station and all associated assets below: • Concrete plinth and above ground kiosk (approx.. 4.6m x 2.6m x 2.1m) • Underground Pipework to connect to existing network • All ancillary development and site works • Associated below ground pipework, fittings and chambers • ESB meter cabinet
• Reconfiguration of the existing layout to accommodate a new drive-thru lane along with associated signage, height restrictor, order points and road markings • Change of use from restaurant to restaurant with take-away • Provision of new brush wash slab with splash screens and queuing lane, car wash cabinet and service bays and new landscaping. • Providing alternations to the existing internal floor area of the service building to include reducing the existing food offers from 4 to 3; reconfiguration of the net retail area which will remain at 100sq.m and reorganisation of part of the back of house area. • Minor extension to the service station building to provide drive-thru hatch use • Providing in new storage/chiller/freezers to the rear of the service station within the existing yard. • Removal of the existing planter to the east side of the service station building. • All associated drainage, signage, height restrictor, order points, and site works.
Construction of a 1200mm high Ball Stop Fencing to surround of pitch Areas, To install Dugouts, Install Terrace Barrier to top of existing Dwarf Wall, Install New Ball Stop Netting, Install associated Astro Areas and all associated Site Works