Woodhouse Estate, Woodhouse, Stradbally
Proposed development
A c.150 kWp renewable energy solar PV installation consisting of up to c.700m2 (355No) Ground Mounted solar panels, Inverter Enclosure Fencing, Underground Cable run and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413).
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 12 Aug 2026
Timeline
Application received
12 May 2026
Decision due
12 Aug 2026
Decision: conditional
22 Jul 2026
Grant issued
2 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the removal of the existing thatched roofs and the replacement with new concrete roof tiles all at numbers 11, 12, 13 and 14.
a c150 kWp renewable energy solar PV installation consisting of up to c700m2 (355No) ground mounted solar panels invertor enclosure and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
a c.150 Kwp renewable energy solar PV installation consisting of up to c.700m2 (355No) Ground mounted solar panels, inverter enclosure and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
a c.150 KWp renewable energy solar PV installation consisting of up to c.700m2(355No).Ground mounted solar panels and all associated works
EXTENSION OF DURATION of planning file ref. 17/448 to construct new single storey dwelling, recessed entrance, waste water treatment system and all associated site works
for the construction of a part single storey/part 2 storey, 4 bedroom detached dweling house to include 6 no. rooflights, new driveway, entrance walls and piers, footpaths, terrace area, landscaping boundary treatments, proposed new waste water treatment system and percolation area, proposed bored well and all associated site works, all at