Woodstock, Cappoquin, Co. Waterford
Proposed development
The minor amendments to development permitted under ref. no 23/60610 and comprises the replacement of a detached timber-frame dwelling with a detached block-work dwelling, including ancillary localised site works. The residential development permitted under ref. no. 23/60610 remains otherwise unchanged.
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 17 Jan 2026
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
14 Nov 2025
Decision due
17 Jan 2026
Decision: conditional
15 Jan 2026
Grant issued
24 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) the change of use of the existing health centre to residential accommodation, (2) the construction of a single storey extension to the northern side of the existing building, (3) door and window alterations to the existing building and (4) an upgraded waste water treatment system along with all associated site works
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application