34 Ferndale, Ballytruckle, Waterford City
Proposed development
The conversion of the existing ground floor garage to a habitable room attached to the front of existing dwelling, extension of the existing hallway to create a longer entrance and re-positioning of the front door to align with the existing front porch and edge of the garage wall. Proposed elevational changes to the front (south) elevation, and alteration of the existing driveway and front boundary wall to create a larger driveway as optional future works
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- Not available
Timeline
Application received
24 Oct 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
by Michelle Doyle for the conversion of existing building to a 3 bedroom 2 storey dwelling, together with all other associated site works
a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, a heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and a district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
Alterations and extension, comprising new entrance porch, new rear extension, new first floor dormer accommodation, 3 no. new rear dormer windows and 3 no. new roof windows at front elevation and all associated siteworks
the demolition of an existing vacant two-storey dwelling house and the subdivision of the site into four residential sites, together with all associated site works,
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
a single storey extension & elevational alterations to existing dressing rooms, including all associated internal alterations & ancillary site works