Ballynageeragh, Dunhill, Co. Waterford
Proposed development
The construction of a residential development containing 44No. dwelling units comprising of 1 No. 4 bed two-storey detached unit, 15No. 4 bed two-storey semi-detached units, 17No. 3 bed two-storey semi-detached units, 4No. 2 bed single-storey detached units, 2No. 2 bed single-storey semi-detached units, 4No. 2 bed two-storey semi-detached units and 1No. 2 bed two-storey terrace unit, together with and all associated site development works including, associated car-parking, site landscaping, footpath links to Dunhill village external to subject site, connection to storm and foul services and the construction of a new vehicular entrance to site from L-4009
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 21 Sept 2026
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
21 Oct 2025
Council asked for further information
11 Dec 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
21 Aug 2026
Decision due
21 Sept 2026
Decision: refused
18 Sept 2026
Appeal lodged (PL-502283-WD-26)
Not available
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
2 no. 2 storey dormer houses, alterations to existing site boundary, new vehicular entrances, carparking and all associated drainage, site works, landscaping and associated works
the construction of a residential development containing 44No. dwelling units comprising of 14No. two-storey 4 bed semi-detached units, 1 No. two-storey 4 bed detached unit, 18No. two-storey 3 bed terrace units, 4No. two-storey 2 bed semi-detached units, 1No. 2 bed terrace unit, 4No. single-storey detached units and 2No. single-storey 3 bedroom semi-detached units, together with and all associated site development works including, associated car-parking, site landscaping, footpath links to Dunhill village external to subject site, connection to storm and foul services and the construction of a new vehicular entrance to site from L-4009
the following existing modifications to the main dwelling which include a)patio bi-folding door system ( to living room) to front elevation. b) existing conversion of roof space to main dwelling (first floor /attic level) which includes internal stairs, office /study,child's playroom,storage room and halfway.c) for 3 no existing roof lights to rear elevation of main dwelling d) for existing on site caravan (used for storage purpose ) to front garden space. e) for existing external and detached onsite single storey play house / storage shed to the front garden space ( adjacent to existing patio area) f) for existing external and detached onsite single storey carpenter's workshop g) and for existing and external detached onsite storey timber storage shed.
single storey dwelling,wastewater treatment system and percolation area, well along with a new entrance and all associated site works
the construction of a single storey, split-level dwelling, borehole for water supply, wastewater treatment system, percolation area, splayed entrance and all associated site works
permission for 2 no. 2 storey dormer houses, alterations to existing boundary, new vehicular entrances, carparking and all associated drainage, site works, landscaping and associated works