Lemybrien, Co. Waterford
Proposed development
Extension of duration of pl. file 19/368: development consisting of the construction of 2 no. 2 bedroom single storey dwelling houses, 6 no. 3 bedroom single storey dwelling houses, 3 no. storey and half 4 bedroom dwelling houses, 5 no. two storey 4 bedroom dwelling houses and 3 no. serviced sites and all associated ancillary site works and associated public service connections and upgrades
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 3 Jul 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
9 May 2025
Decision due
3 Jul 2025
Decision: conditional
27 Jun 2025
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
sought to raise levels of agricultural lands by 0.5m to 1.0m approximately, using inert material arising from the excavations of the adjacent housing development (Cluain Shuí Finn) and also by using imported inert soil and stone classified as Article 27 by-products of the construction industry
(1) the removal of the existing house and mobile home, (2) the construction of a replacement house, (3) the construction of a new waste water treatment system and (4) the construction of a garage along with all associated site works at Knockeylan, Leamybrien, Co. Waterford, X42 YY88.
of an existing single storey rear extension
build 10 no. three bedroom and four bedroom, detached, single storey houses and 21 no. three bedroom and four bedroom, detached and semi detached, two storey houses, together with a detached, single storey community care building of 226m2, consisting of four ensuited bedrooms and one carer’s ensuited bedroom and with all it’s necessary site development works of entrance to the community care site, it’s forecourt, car parking and necessary services. A pedestrian path and cycle path is provided transversing this proposed housing estate, exiting to the N25 public road at the designated bus stop and allowing access to the existing village services from the GAA Centre and from St Annes Court housing to the South of the proposed housing layout. Also the installation of all necessary estate site development works and services, including foul drainage to the existing nearby Local Authority treatment plant, storm water attenuation outfalling to existing watercourse and connection of domestic water supply from the public mains on the adjoining N25 public road.
for development consisting of a change of use from retail use (10 sq.m) to retail with ancillary off Licence use.
of the existing domestic garage structure