Unit 4, First Floor, Castle House
Proposed development
A change of use from Office / Consultancy use to a 3 bedroom,with communal kitchen, Living,Dining space apartment for the purpose of student accommodation.The apartment unit has been designed in accordance and in compliance with QHSN45(Third Level Student Accommodation guidelines). The development shall include all necessary and associated site works
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- 25 Jun 2025
Timeline
Application received
26 Feb 2025
Council asked for further information
16 Apr 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
29 May 2025
Decision due
25 Jun 2025
Decision: conditional
24 Jun 2025
Grant issued
5 Aug 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, a heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and a district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
for material alterations to as Granted Planning Application 23/60288 (ABP-3200361-24) at existing Sinnotts property which occupies nos. 1, 2 & 3 Manor Street and nos. 27 - 31 John Street and rear of 31A and 32 John Street, Waterford, namely for the construction of an additional floor at 1-3 Manor Street, Waterford and the change of use of previously granted roof space at 27-28 John Street, Waterford, with the addition of dormer windows to provide an additional 2no student apartments of 6 beds and 3 beds with associated common rooms, all with associated site development works
Planning permission is sought for a material change of use from vacant retail unit to amusement and entertainment centre on two levels, together with modifications to front and side elevations including new signage and all associated site works
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
a single storey extension & elevational alterations to existing dressing rooms, including all associated internal alterations & ancillary site works
the single storey front bay window and side garage extensions as constructed