Paddy Brownes Road, Lisduggan, Waterford
Proposed development
Relocation of an existing ATM on the north west elevation including new ATM room, alterations to existing elevations and associated signage
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- Not available
Timeline
Application received
6 Nov 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
To construct a two storey extension to the side of my property. To provide a ground floor entrance lobby and cloak room and first floor ensuite and wardrobe. For private residential use.
40 No Apartments consisting of 24 No. 1-Bedroom Units, 5 No. 2-Bedroom Units & 11 No. 3- Bedroom Units), Entrance and Access Roads via Keanes Road Connection to public foul and surface water drainage system All associated site works
To construct a two storey extension to the side of my property, to provide a ground floor entrance lobby and cloak room and first floor ensuite and wardrobe.
for a ground floor change of use from an existing Bookmakers shop to a Café/Restaurant with take away facility, together with internal and external alterations, signage, and associated site works
The proposed development will consist of the construction and operation of a development consisting of an energy centre building, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure within the townland of Kingsmeadow together with an associated heat pipeline network extending from the proposed energy centre building along sections of Kilbarry Road, Cork Road (R680) and Brown’s Road through the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. The Waterford Energy Centre building will integrate multiple low carbon energy technologies including the installation of Air Source Heat Pumps (ASHPs), and gas boilers, for peak load support and emergency back up. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a diameter of 450mm each, spanning a distance of approximately 1,470m in an underground trench, from the proposed energy centre building, extending onto Kilbarry Road, crossing into Cork Road (R680) travelling the length of Cork Road before terminating outside the IDA Industrial Estate on Brown’s Road, linking the proposed Waterford Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings in the area (Proposed Development) within the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. A 10 year permission is sought for the construction of the proposed development. Forthe purposes of the Renewable Energy DirectiveIII(Directive(EU)2023/2413),the proposed development includes relevant solar energy development comprising approximately21.6kWofroofmountedsolar PV and the installationof3no. small scale1.5MWnon-ground, air source heat pumps. InaccordancewithArticle239of the PlanningandDevelopmentRegulations2001(as amended)
for a Dormer extension to the rear roof plane of the existing dwelling and the use of the attic as a storage space, retention is also sought for the widening of the opening in the front boundary wall and the widening of the paved area for the driveway along with all associated site development works