Following: 1)Partial demolition of the existing two-storey terraced building at 64 O’Connell Street. 2)Change of use of part of the existing two-storey terraced building from retail/residential to hostel accommodation at 64 O’Connell Street. 3)Proposed redevelopment of the partially demolished building at 64 O’Connell Street, involving the provision of 3 No. floors above existing ground floor with a four-storey extension to the rear. 4)Proposed provision of an internal connection on all floors between No.63 O’Connell Street and No. 64 O’Connell Street to create a one,four-storey building of a total height of 11.862 meters,consisting of 24-bedroom hostel/guest accommodation and a ground floor shop unit. 5)Proposed alterations to the elevations of No.63 O’Connell Street, which differ from the elevations previously granted under planning register number 20221024. 6)Proposed connection to existing public services
- Applicant
- Not published
- Authority
- Waterford City and County Council
- Decision due
- Not available
Timeline
Application received
23 Dec 2024
Council asked for further information
21 Feb 2025
Decision due
Not available
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
extension or alterations to a home
EXTENSION OF DURATION of pl. file 19/694 alterations to ground floor front elevation shop front to include a separate entrance doorway and internal staircase to
85 O'Connell Street, Dungarvan, Co. Waterford · refused 17 Oct 2025 · about 150 m away · 25119
extension or alterations to a home
EXTENSION OF DURATION of planning ref. 17/236 for a second public entrance to the front of the property
Unit 5 Dungarvan Shopping Centre, High Street, Dungarvan · refused 2 Aug 2022 · about 190 m away · 22524
Planning history within 750 m
the subdivision of the unit and reinstatement of the compartment wall dividing Units 7 and 8A into 2no. separate individual units. And proposed change of use of both units from café/restaurant use, back to retail use.
renewal of licence 254 required for outdoor seating under 59 Ft. Awning. This area is inside a glass screen. There are 6 tables for 4 people and 4 tables for 2 people,also 1 table circle for 2 people.The licence is required for 5 years
a Section 254 License of current outside seating area
the subdivision of the unit and reinstatement of the compartment wall dividing Units 7 and 8A into 2no. separate individual units. Also proposed change of use of both units from café/restaurant use, back to retail use.
We would like to apply for change of use to Short Term Let. Whilst we use the property ourselves when visiting our family who live in Dungarvan, usually during Summer months, we would like the flexibility to have it occupied with short term tenants when we are not in Ireland, in the event we cannot find someone to occupy it and vacate during the times we want to use it. All work designated 'Proposed' in drawings was completed by August 2024, and the property has been subject to an agreement with 360Stay (PHP Hospitality Partners Ltd) since September 2024, initially for them to arrange short term lets, and (since 27th February 2026) for them to use for longer term rentals. They have now expressed their wish to discontinue this arrangement.
(A) PROVISION OF TEMPORARY ACCESS ROAD FROM EXISTING ROADSIDE GATE FOR CONSTRUCTION TRAFFIC DURING THE PROPOSED WORKS; (B) MODIFICATIONS TO AND EXTENSION OF EXISTING SITE ACCESS ROAD, INCLUDING NEW FOOTPATHS, LANDSCAPING, LIGHTING, BOUNDARY TREATMENTS, BELOW GROUND UTILITIES AND CONNECTIONS TO MAINS SERVICES; (C) MINOR ALTERATIONS TO PROPOSED ENTRANCE WALLS GRANTED UNDER PERMISSION 2460185; (D) CONSTRUCTION OF NEW 1,710M2 DISTRIBUTION FACILITY/LOGISTICS CENTRE BUILDING AND ASSOCIATED WORKS INCLUDING ROOF-MOUNTED SOLAR PV PANELS; VEHICULAR ENTRANCE ROADS AND PARKING; ELECTRIC VEHICLE CHARGING POINTS; HARD AND SOFT LANDSCAPING; SURFACE WATER RETENTION POND; BOUNDARY TREATMENT; BELOW GROUND UTILITIES AND CONNECTIONS TO MAINS SERVICES (E) NEW ESB MV SUB-STATION BUILDING AND ASSOCIATED SITE WORKS.