Castlequarter, Toomevara, Nenagh
Proposed development
Renovations & extensions to existing house with all associated site works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 8 Jan 2027
Timeline
Application received
5 Nov 2026
Last day for public submissions (est.)
Wed 9 Dec 2026
Decision due
8 Jan 2027
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
two story extension to rear of property, including kitchen and bathroom on ground floor, bedroom and bathroom on first floor
a single storey flat roof extension to the rear, alteration of roof profile of existing ground floor side and rear extension to a flat roof, replacement of existing pitched roof on front porch with a flat roof, widening of front vehicular access with partial removal of boundary wall
the construction of a vehicular entrance, dwelling house, domestic garage, connection to mains sewer together with all associated site works
the installation of 6 no. new 20m lighting columns complete with 5 no. LED pitch floodlights on each column to illuminate the training pitch and replace the current pitch lighting system on site. Permission is also sought for 13 no. streetlights on 6m lighting columns including associated civils to replace the existing perimeter walkway lighting system on site
alterations & renovations to house with all associated site works
(1) a wooden decking area to the front of the domestic dwelling (decking area built in 2016); (2) a clear pergola type covered area over this decking. This covered area is to allow for rain water harvesting for watering purposes of raised vegetable area built into the decking area. The newly built covered area which is incomplete is to be open on one side and front and partially closed on the second side