Land adjacent St Patrick's Catholic Church, Faugheen, Carrick On Suir Co. Tipperary
Proposed development
Construction of a new 50 space car park and all associated works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 7 Dec 2026
Timeline
Application received
6 May 2026
Last day for public submissions (est.)
Tue 9 Jun 2026
Council asked for further information
26 Jun 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
10 Nov 2026
Decision due
7 Dec 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the amendments to Planning Ref 2260702 including the following: additional floor area at first floor level, increased height to storey and a half section of dwelling to rear, alterations to windows on West & South elevations, alterations to dormer roofs on West elevation, additional windows at first floor level on North & East elevations, alterations to canopies on East & North elevations and associated site works
the storage/kitchen area (137 sq.m), the temporary outdoor covered dining area (85 sq.m), temporary dining pods and hard landscaping (112 sq.m) and the existing carpark (410 sq.m) as constructed and associated entrance onto Newtown Manor. Planning Permission is also being sought for (a) the removal of the storage area and temporary structures and the replacement with a permanent extension of 577 sq.m including a restaurant (110.3 sq.m), a kitchen (138.8 sq.m) a function room (191.9 sq.m), an outdoor covered dining area (111 sq.m), toilets and ancillary circulation space; together with associated internal alterations to public house and first floor apartment; (b) upgrade works to the carparking area (including re-surface, line markings, etc.), and erection of a timber boundary fence to the eastern boundary; (c) decommissioning of existing on-site effluent treatment system and replacement with connection to public mains via proposed on- site pumping station; together with all associated works
a) Retention of storage/kitchen area (137 sq.m), retention of temporary outdoor covered dining area (85 sq.m), temporary dining pods and hard landscaping (112 sq.m) and retention of existing carpark (410 sq.m) as constructed and associated entrance onto Newtown Manor; b) Removal of storage area and temporary structures and replacement with a permanent extension of 577sq.m including a restaurant (110.3sq.m), a kitchen (138.8sq.m) a function room (191.9sq.m), an outdoor covered dining area (111sq.m), toilets and ancillary circulation space; together with associated internal alterations to public house and first floor apartment; c) Upgrade works to the carparking area (including re-surface, line markings, etc.), and erection of a timber boundary fence to the eastern boundary; d) Decommissioning of existing on-site effluent treatment system and replacement with connection to public mains via proposed on- site pumping station, together with all associated works
demolition of garage at side (West) of existing dwelling house, construction of one and a half storey extension to rear (North) of existing dwelling, renovation of existing dwelling house including alterations to existing elevations, construction of new garage, relocation of entrance driveway and associated site works
works carried out at our property comprising of the construction of a covered outdoor dining space, extension to rear of property for storage and staff circulation associated with the kitchen space, storage unit to rear of property, vehicular entrance opening to the South road facing boundary wall and hardcore surface area on site for the purpose of on-site parking and all associated site works
construction of a shed incorporating an easy feed slatted cubicle area, incorporating cubicles, feed barriers, canopy, slatted underground slurry tank for dairy cows, new farm entrance and all associated site works