Drominagh Wood Kylenoe, Terryglass, Nenagh
Proposed development
The alterations to the existing dwelling house, including: 1) demolition of annexes to the north eastern, south eastern and south western sides of existing dwelling house, and removal of two existing chimney stacks; 2) modifications of existing roof, windows, external elevations and internal layout of dwelling house; 3) infilling of existing basement floor level; 4) construction of single-storey extension to south western side of existing dwelling house; 5) decommissioning of existing underground septic tank and the construction of a replacement wastewater treatment system & soil polishing filter; and all ancillary site works thereto
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 26 May 2026
Timeline
Application received
1 Apr 2026
Decision due
26 May 2026
Decision: conditional
15 May 2026
Grant issued
18 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a single storey kitchen/livingroom extension to the existing kitchen at the rear of the existing single storey house, to include all associated site works
a single storey kitchen/living room extension to the existing kitchen at the rear of the existing single storey house, to also include all associated site works
demolition of existing outbuildings and storage to the east of the existing dwelling with the proposed construction of a single storey extension to the east, provision of additional window opes to both the north and south elevation, additional rooflights, the enlargement of an existing first floor window to the west including all internal modifications, creation of an upper terrace to the south and proposed outbuilding to the north east including all associated site works
short term tourist accommodation incorporating individual holiday suites and micro camping facility within existing historic orchard. The development will consist of a) 7 no. detached suites to accommodate 1-2 people with external decking, en-suite bathrooms, kitchenettes and ancillary facilities, all structures are positioned on timber platforms b) 3 no detached suites to accommodate 1 - 6 people with external decking, en-suite bathrooms, kitchenettes and ancillary facilities, all structures are positioned on timber platforms c) change of use of existing dwelling to reception area d) refurbishment of existing dwelling to provide for a reception and lounge area with utility and toilet facilities e) kitchen extension to existing dwelling f) yoga space to rear of reception g) camping area h) bicycle shelter and barbeque area i) alterations and improvements to existing entrance from laneway j) secondary effluent treatment system with sand polishing filter k) PV solar panels l) car parking at proposed reception area and 14 car parking spaces along western boundary of site m) permeable grass reinforced mesh pathways n) indoor and outdoor geothermal heat pump unit o) rainwater harvesting unit and all associated site works
short term tourist accommodation, incorporating individual holiday suites and micro camping facility within existing historic orchard. Development will consist of (a) 7 no. detached suites to accommodate 1-2 people with external decking, en-suite bathrooms, kitchenettes and ancillary facilities, all structures are positioned on timber platforms (b) 3 no. detached suites to accommodate 1-6 people with external decking, en-suite bathrooms, kitchenettes and ancillary facilities, all structures are positioned on timber platforms, (c) refurbishment of existing dwelling to provide for a reception and lounge area with utility and toilet facilities (d) a yoga workshop building to rear of reception, (e) alterations and improvements to existing entrance from laneway, (f) a secondary effluent treatment system with sand polishing filter, (g) 14 car-parking spaces along western boundary of site, (h) signage at either side of site entrance from public road and all associated site works