Lisbunny, Nenagh, Co. Tipperary
Proposed development
1) the demolition of an existing shed, 2) to renovate and extend existing cottage, 3) to install new wastewater treatment system, 4) to upgrade an existing entrance and all associated site works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 16 Apr 2026
Timeline
Application received
20 Feb 2026
Decision due
16 Apr 2026
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a garage and a storage shed
the addition of a 51m2 single storey summer house structure with ancillary patio space to the rear of the existing dwelling and adjoining an existing outbuilding
the subdivision and change of use of portion of the former Rorer Factory unit for use as a community building to be operated by the A-team. Permission is also sought for internal alteration of the building, the provision of signage on the building, new pedestrian access gate from the public footpath along the Dublin road and covered bicycle storage area
Subsivision and Change of use of portion of the former Rorer Factory unit at Lisbunny Industrial Estate, Lisbunny, Nenagh County Tipperary for use as a Community building to be Operated by the A-team. Permission is also sought for Internal alteration of the building, the provision of signage on the building, new pedestrian access gate from the public footpath along the Dublin road and Covered Bicycle storage area.
the renovation and extension of existing house, demolition of the shed to rear and construction of a garage, and RETENTION Permission for relocation of entrance
1. Domestic garage on site, 2. extension to side of existing dwelling and 3. minor modifications to rear elevation from that granted under PL ref 08520009