Tinvoher, Loughmore Templemore, Co. Tipperary
Proposed development
Change of design from that previously granted under Planning Permission Ref 2560216 The changes consist of the following alterations a) Change to house extension design b) All associated site works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 25 Mar 2026
- Residential units
- 1
- Floor area
- 73.4 m²
Timeline
Application received
29 Jan 2026
Decision due
25 Mar 2026
Decision: conditional
10 Mar 2026
Grant issued
13 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construction of a new extension to the side of existing dwelling along with a new tertiary treatment system and infiltration/treatment area and all associated site works
new extension to side of dwelling along with new tertiary treatment system and infiltration/treatment area and all associated site works
(1) 2 no. rear extensions to existing dwelling house; (2) the domestic storage sheds to the rear of the dwelling house and all associated site works
a) alterations to previously approved planning application register reference number 21/1849; the alterations relate to the change of the previously approved design for the extension and alterations to the existing dwelling; b) all associated site works
amendment of previously granted planning reference 21468 for the redesign of the single storey rear extension to a two storey rear extension including elevational changes to the existing facades, the additions of 3 rooflights to the front of existing roof and 4 rooflights to the rear of the new extension and all associated site works
a) proposed new single storey extension to the existing dwelling, b) associated alterations to existing dwelling, external elevations to accommodate proposed new extensions and internal layout, c) demolition of existing garage structure, d) proposed new detached garage structure, e) proposed new waste water treatment system and percolation area, f) all associated site works