262Grantedretention

Annaholty, Birdhill, Co. Tipperary

Not open for objections: The council has already decided this application.

Proposed development

An extension to the side of house and domestic garage and fuel stores

Applicant
Not published
Authority
Tipperary County Council
Decision due
10 Mar 2026
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    14 Jan 2026

  2. Decision due

    10 Mar 2026

  3. Decision: conditional

    2 Mar 2026

  4. Grant issued

    5 Apr 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660621Awaiting decision

RED III development which will consist of planning permission for a period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2 no. primary anaerobic digesters (height c. 18.5m); 1 no. secondary digester/storage tank (dome height c. 16.5m); 1 no. digestate storage tank (dome height c. 16.5m); 2 no. manure reception tanks (dome height c. 12m); 1 no. desulphurisation unit (ground floor area (GFA) c. 13m2, height c. 3.3m), 1 small tank (height c. 3.2m) and 2 larger tanks (height c 9.8m & c 11.8m); 2 no. pasteurization tanks (height c. 5.6m) and 2 no. cooling tanks (height c. 5.6m); 1 no. external Solid Input Device (SID); 1 no. pump room (GFA 300m2, height 3.1m); these components will be located within a containment bund (height c. 1.5m). The proposed development will also consist of: 1 no. feedstock reception hall (GFA 1,800m2, height c.15m) with air filtration unit (stack height c. 20.5m), 1 no. underground mixing tank (diameter c.16m, height c. 4m), 1 no. SID, offices, and workshop; 5 no. silage clamps (GFA 8,640m2, height c. 5m); 1 no. storage shed (GFA 228m2, height c. 5m); 1 no. rainwater harvesting tank (height c. 6m); 1 no. fire water storage tank (height c. 5.5m); 1 no. plant room (GFA c. 90m2, height c. 5.3m); 2 no. CHP units and chillers (GFA 44m2 each, maximum height c. 7.5m to flue); 1 no. bunded biofuel tank (length c. 6.2m, height c. 2.3m); and diesel tank (length c. 4m, height 2.5m); 1 no. dewatering storage building (GFA c. 263m2, height c. 5.5m) with air filtration unit (stack height c. 9.5m); 1 no. ESB substation building (GFA c. 65m2, height c. 3.8m); 1 no. biomethane upgrade unit (GFA c. 235m2, height c. 13.2m); 1 no. carbon dioxide capture unit (GFA c. 885m2, height c. 16.7m); 1 no. two storey admin building containing offices, laboratories, and welfare facilities (GFA 228m2, height c. 8.2m); 1 no LPG compound (GFA 98m2) with bunded wall (height c. 2.5m) containing 2 no. propane tanks (diameter c. 1.5m, length c. 4.8m); 1 no. emergency flare (height c. 7.7m); 1 no. Gas Networks Ireland (‘GNI’) compound (‘Biomethane Network Entry Facility’) kiosk (GFA c. 24m2, height c. 5.1m (antenna)) with two parking bays; firewater retention pond (c. 1,750m3); infiltration basin (c. 2300m3); underground silage clamp tank, (c. 3,725m3), boundary treatments and ancillary works that will include: tree felling to facilitate construction and operation of the proposed development; new site entrance off the L94

Thornhill and Annaholty, Birdhill, Co. Tipperary Tipperary County Council Received 25 Jun 2026
2561056Awaiting decision

RED III a period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2 no. primary anaerobic digesters (height c. 18.5m); 1 no. secondary digester/storage tank (dome height c. 16.5m); 1 no. digestate storage tank (dome height c. 16.5m); 2 no. manure reception tanks (dome height c. 12m); 1 no. desulphurisation unit (Ground Floor Area (GFA) c.13m2, height c.3.3m), 1 small tank (height c. 3.2m) and 2 larger tanks (height c 9.8m & c 11.8m); 2 no. pasteurization tanks (height c. 5.6m) and 2 no. cooling tanks (height c. 5.6m); 1 no. external Solid Input Device (SID); 1 no. pump room (GFA 300m2, height 3.1m); these components will be located within a containment bund (height c. 1.5m). The proposed development will also consist of: 1 no. feedstock reception hall (GFA 1,800m2, height c.15m) with air filtration unit (stack height c. 20.5m), 1 no. underground mixing tank (diameter c.16m, height c. 4m), 1 no. SID, offices, and workshop; 5 no. silage clamps (GFA 8,640m2, height c. 5m); 1 no. storage shed (GFA 228m2, height c. 5m); 1 no. rainwater harvesting tank (height c. 6m); 1 no. fire water storage tank (height c. 5.5m); 1 no. plant room (GFA c. 90m2, height c. 5.3m); 2 no. CHP units and chillers (GFA 44m2 each, maximum height c.7.5m to flue); 1 no. bunded biofuel tank (length c. 6.2m, height c. 2.3m); and diesel tank (length c. 4m, height 2.5m); 1 no. dewatering storage building (GFA c. 263m2, height c. 5.5m) with air filtration unit (stack height c. 9.5m); 1 no. ESB substation building (GFA c. 65m2, height c. 3.8m); 1 no. biomethane upgrade unit (GFA c. 235m2; height c. 13.2m); 1 no. carbon dioxide capture unit (GFA c. 885m2, height c. 16.7m); 1 no. two storey admin building containing offices, laboratories, and welfare facilities (GFA 228m2, height c. 8.2m); 1 no LPG compound (GFA 98m2) with bunded wall (height c. 2.5m) containing 2 no. propane tanks (diameter c. 1.5m, length c. 4.8m); 1 no. emergency flare (height c. 7.7m); 1 no. Gas Networks Ireland (‘GNI’) compound (‘Biomethane Network Entry Facility’) kiosk (GFA c. 24m2, height c. 5.1m (antenna)); firewater retention pond (c. 1,750m3); Infiltration Basin (c. 2300m3); underground silage clamp tank, (c. 3,725m3), boundary treatments and ancillary works that will include: tree felling to facilitate construction and operation of the proposed development; new site entrance off the L94451, security gates and fencing; access roads and yards; 1 no. weighbridge; 2

Thornhill and Annaholty, Birdhill, Co Tipperary Tipperary County Council Received 21 Oct 2025
2560984Awaiting decision

a period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2 no. primary anaerobic digesters (height c. 18.5m); 1 no. secondary digester/storage tank (dome height c. 16.5m); 1 no. digestate storage tank (dome height c. 16.5m); 2 no. manure reception tanks (dome height c. 12m); 1 no. desulphurisation unit (Ground Floor Area (GFA) c.13m2, height c.3.3m), 1 small tank (height c. 3.2m) and 2 larger tanks (height c 9.8m & c 11.8m); 2 no. pasteurization tanks (height c. 5.6m) and 2 no. cooling tanks (height c. 5.6m); 1 no. external Solid Input Device (SID); 1 no. pump room (GFA 300m2, height 3.1m); these components will be located within a containment bund (height c. 1.5m). The proposed development will also consist of: 1 no. feedstock reception hall (GFA 1,800m2, height c.15m) with air filtration unit (stack height c. 20.5m), 1 no. underground mixing tank (diameter c.16m, height c. 4m), 1 no. SID, offices, and workshop; 5 no. silage clamps (GFA 8,640m2, height c. 5m); 1 no. storage shed (GFA 228m2, height c. 5m); 1 no. rainwater harvesting tank (height c. 6m); 1 no. fire water storage tank (height c. 5.5m); 1 no. plant room (GFA c. 90m2, height c. 5.3m); 2 no. CHP units and chillers (GFA 44m2 each, maximum height c.7.5m to flue); 1 no. bunded biofuel tank (length c. 6.2m, height c. 2.3m); and diesel tank (length c. 4m, height 2.5m); 1 no. dewatering storage building (GFA c. 263m2, height c. 5.5m) with air filtration unit (stack height c. 9.5m); 1 no. ESB substation building (GFA c. 65m2, height c. 3.8m); 1 no. biomethane upgrade unit (GFA c. 235m2; height c. 13.2m); 1 no. carbon dioxide capture unit (GFA c. 885m2, height c. 16.7m); 1 no. two storey admin building containing offices, laboratories, and welfare facilities (GFA 228m2, height c. 8.2m); 1 no LPG compound (GFA 98m2) with bunded wall (height c. 2.5m) containing 2 no. propane tanks (diameter c. 1.5m, length c. 4.8m); 1 no. emergency flare (height c. 7.7m); 1 no. Gas Networks Ireland (‘GNI’) compound (‘Biomethane Network Entry Facility’) kiosk (GFA c. 24m2, height c. 5.1m (antenna)); firewater retention pond (c. 1,750m3); Infiltration Basin (c. 2300m3); underground silage clamp tank, (c. 3,725m3), boundary treatments and ancillary works that will include: tree felling to facilitate construction and operation of the proposed development; new site entrance off the L94451, security gates

Thornhill and Annaholty, Birdhill, Co Tipperary Tipperary County Council Received 2 Oct 2025
24168Granted

a new farm building and an underground effluent storage tank

Thornhill Stables, Thornhill, Birdhill Tipperary County Council Received 23 Jul 2024
2260648Granted

renovation and refurbishment works to the existing two-storey dormer farmhouse to include thermal envelope upgrades, the removal of three 1980s dormer windows to the front pitch of the house, alterations and extension to a detached but associated agricultural building to provide ancillary habitable accommodation to the main farmhouse, site works will include the decommissioning of an existing septic tank and installation of a proposed new wastewater treatment system

Annaholty, Birdhill, Co.Tipperary Tipperary County Council Received 25 Nov 2022
2260635Granted

the demolition of an existing dwelling & construction of a replacement dwelling, separate shed/store, removal of an existing agricultural shed, new septic tank & percolation area, revised entrance & associated works.

Annaholty, Birdhill, Co. Tipperary Tipperary County Council Received 18 Nov 2022