Baunreagh House, Western Road, Clonmel
Proposed development
A single storey pergola on the western side of the existing creche building, and PLANNING PERMISSION to build a single storey creche extension to the eastern side of the building including all associated site development works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 1 Nov 2026
Timeline
Application received
30 Jul 2026
Council asked for further information
21 Sept 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
5 Oct 2026
Decision due
1 Nov 2026
Decision: conditional
29 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the extension and renovation of existing dwelling house including elevational changes and all associated site development works
the construction of a residential housing estate. The development will consist of the construction of a 55-unit residential estate, comprising: 10 no. semi-detached 4-bedroom 2-storey houses; 32 no. semi-detached 3-bedroom 2-storey houses; 1 no. detached 2-bedroom single-storey house; 2 no. 2- storey terraced blocks containing 4 No. 2-bedroom mid terrace townhouses and 4 no. end of terrace 3-bedroom townhouses; and 1 no. 2-storey maisonette apartment block containing 4 no. 2-bedroom apartments. Other works as part of the development will include: (a) connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097, and (b) the adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout
the construction of a residential housing estate to the rear of Gort Na Manach, Cahir Road, Inishlounaght T/D, Clonmel, Co. Tipperary. The works are summarized as – 1. Construction of a 55-unit residential estate, 2. The development will include: a. 10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3- bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities- permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works
to demolish the existing shed and construct a new dwelling house, entrance, driveway and all associated site development works
the construction of a residential housing estate. The works are summarized as, 1. Construction of a 55-unit residential estate. 2. The development will include, a.10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3-bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. 6. An Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report have been submitted with the application
a) the as-constructed western boundary, b) the as-constructed southern boundary and c) the as-constructed soakaway for the public road, including all associated site development works