Coláiste Phobal Ros Cré, Corville Road, Roscrea Co. Tipperary
Proposed development
The construction of a new 800 pupil Secondary School to include General Classrooms, Specialist Classrooms, a General-Purpose Hall, PE Hall, Offices, Staff Room, Library, Sanitary Facilities and ancillary spaces. The development also includes the provision of: - • Demolition of existing school buildings and extensions with the demolition/removal of all existing prefabs from the site. • Minor alterations to the retained original school building. • Enlarged school vehicle, pedestrian and cycle entrance from Corville Road, with drop off/collection area, cycle and foot paths, bicycle spaces and 80 no. car parking spaces. • 5 no. ball courts, landscaped gardens, and external social space. • Heat pump and gas storage areas, external stores and bin storage area. • Landscaping works, boundary treatments, associated drainage, all other site services, site development and all ancillary siteworks
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 12 Jul 2026
Timeline
Application received
18 Dec 2025
Council asked for further information
17 Feb 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
12 May 2026
Decision due
12 Jul 2026
Decision: conditional
6 Jul 2026
Grant issued
9 Aug 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
housing development consisting of 1 pair semi-detached two bedroom bungalows, 1 detached 3 bedroom bungalow and 4 no. 2/3 bedroom terraced two storey townhouses with access roads/paths etc. and ancillary service connections
development for alterations and a change of house design and site layout from that previously approved under planning register reference No: 2560634. The proposed modifications will consist of the omission of the permitted bungalow, the construction of 2 No. Semi-Detached dormer bungalows, revisions to the permitted site layout to provide 2 No. separate vehicular site entrances in lieu of the previously approved single entrance, and all associated site works
new garage/storage shed and all associated site works
RED III development which will consist of the installation of ground-mounted solar panels and all associated site works, this development relates to a protected structure
A) the change of use of the existing Bridewell (Gaol) and Temperance Hall buildings from an educational facility/offices to residential use comprising of: 7 no. one-bedroom and 4 no. two-bedroom apartments, B) the demolition of an existing non-historic flat roof section, C) the construction of a proposed external stairwell to the side of the rear Temperance Hall building, D) elevational changes to include a proposed external door & window to replace existing opes to the front (northern façade) of the Bridewell building, 2 no. proposed balconies to the rear (southern façade) of the Bridewell building as well as proposed fenestration to the northern, eastern and western elevations of the Temperance Hall building, and E) proposed raising of height of the existing northern boundary wall along with all associated site development and facilitating works. This is a Protected Structure
a new storey and three-quarter style dwelling and detached single car garage, the opening of a new vehicular entrance to the site off the existing right of way and wastewater treatment system and polishing filter together with all associated site development works