Bohermore, Cashel, Co. Tipperary
Proposed development
The development which will consist of: (1) Main Roof: Strip all non-original plastic gutters at eaves and replace all gutters with black colour alu-cast heritage-style half round gutters and down-pipes. Repair, or if necessary replace, existing lead flashings and cover flashings at chimneys and bay windows. Insulate at attic floor level with mineral wool insulation laid between and over the existing joists. (2) External Walls: Repair, or replace if necessary, damaged cementitious plaster. Carry out structural repairs to to any cracks or defects as detailed on Architect elevation drawings: Hack off loose, damaged or hollow areas of render and re- render to match original; clean and re-decorate. Provide all necessary lead flashings and cover flashings. (3) Front door: A conservation grade joiner/carpenter to be employed to make repairs to original single-glazed ornate fanlight over non-original front door. As secondary pane of glass to be neatly installed internally to provide adequate thermal break and draft exclusion. (4) Rear Bay-Window: Existing dilapidated PVC plastic bay window to kitchen is to be removed and disposed of. the existing 1.8m wide opening in rear wall is to be widened to 2.8m winder opening allowing for a needed dining area in kitchen at bay window. A conservation grade joiner/carpenter is to be employed to make new hardwood bay window to architect’s design. Bay-window supporting wall to be formed in English bonded red bricks set in pale cream colour lime mortar. Bay-window insulated roof dressed in Code 5 lead work by suitable skilled crafts-person. (5) New hardwood glazed back-door to replace non-original aluminium door. (6) Internal non-structural remodelling of ground floor kitchen and back-kitchen areas as per the architects drawings. (7) All existing internal electrical system to be carefully removed and replaced as per architects drawings and details. Care is to be taken to ensure no damage to important original features such as the plaster work to hallway ceiling and walls. In so far as is possible all new electrical will be housed in a secondary service zone behind new timber wainscotting. Chasing and drilling of original walls to be avoided. (8) All existing internal plumbing to be carefully removed and replaced as per architects drawings and details. Care is to be taken to ensure no damage to important original features such as the plaster work to hallway ceiling. The development will consist of work to a Protected Structu
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
17 Dec 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the removal/deconstruction of an external bar and canopy structure to the rear yard, and RETENTION PERMISSION for 1) combining two public houses into one public house, and 2) constructing toilet facilities associated with public house, including all associated site development works
1) a domestic extension to the rear of the dwelling, 2) the construction of the roof of the dwelling to a lower ridge height than that originally permitted, 3) elevational amendments, and including all associated site development works
1) domestic extension to the rear of the dwelling, 2) the raising of a portion of the roof to the rear of the dwelling, 3) a boiler house, 4) a fuel shelter, 5, the removal of the roadside boundary wall and the construction of a roadside railing and gate, and including all associated site development works
the construction of a four-storey extension to the existing Cashel Palace Hotel comprising 29 no. additional guestrooms, front of house reception area, meeting/conference rooms, gym, hair salon, juice bar, rooftop restaurant and bar area, together with ancillary staff and back of house uses including administration office, kitchen, plant/comms areas and storerooms. The proposed extension will link to the main hotel via the existing Spa Building with the construction of a glazed link corridor positioned at first floor level within the proposed extension. Internal works are also proposed within the existing Spa Building to facilitate this including demolition works to facilitate construction of the glazed link and the construction of an access stairs, and internal demolition works to facilitate reconfiguration of the Spa reception area and internal access arrangement. The development also includes upgrades to the Main Street / Buckley Carpark to provide a new link street, upgrades to the existing carpark including revised carparking layout, and the construction of a new surface carpark to provide additional private carparking spaces to serve the hotel within the rear garden of the AIB Bank, no. 66 Main Street, Cashel, Co. Tipperary to be facilitated by the partial demolition of the party wall separating the AIB curtilage from the existing public carpark and creation of a controlled (barriered) vehicular entrance. Landscaping and public realm upgrades, site services including drainage infrastructure, and all associated ancillary development works are also proposed. Part of the site is located within the Cashel Town Architectural Conservation Area. The works will be carried out within the curtilage of the following 5 structures on the Record of Protected Structures of the Cashel and Environs Development Plan 2009-2015: RPS Ref. 7 (Cashel Town Walls); RPS Ref. 8 (Cashel Palace Hotel); RPS Ref. 80 (Palace School House), RPS Ref. 81 (Cashel Palace Gate Lodge) and RPS Ref. 30 (No. 66 Main Street). No direct works are proposed to many of the listed protected structures with the exception of RPS30
the filling of existing land depression /quarry and to reinstate ground with inert material to original levels, subject to approval of an Article 57 licence & to also include all associated site development works for a temporary haul path & alteration of existing entrance
fill the existing land depression /quarry and reinstate ground with inert material to original levels including all associated site development works