Gortlandroe Industrial Estate, Nenagh, Co. Tipperary
Proposed development
Change of use from a car park into a storage area for completed modular units and raw materials. Erection of 2.3m Fence and an electric roller gate around yard
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
3 Dec 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the demolition of a glazed wall and construction of disabled toilet extension together with all associated site works
Alterations & Amendments to developments permitted under Planning Reference No.s. 22/60527, 22/60564, 23/60273 and 23/60274 including: 1.) Removal of Condition 1(d) of the Permission granted under Planning Reference No. 23/60273 and the implementation of a revised construction phasing plan for the entire development area permitted under Planning Reference No.s. 22/60527, 22/60564, 23/60273 and 23/60274; 2.) Revisions to insurance bond/ cash deposit security calculations Conditions of Planning Ref. No.s. 22/60527, 22/60564, 23/60273 and 23/60274 to align with the revised construction phasing plan and corresponding number of units in each revised phase; 3.) Revisions to block finished floor levels and all associated building levels along with all adjoining road, path and landscape finished levels at the south of the lands in the area of developments permitted under Planning Ref. No.s. 22/60527, 22/60564 and 23/60274; & 4.) All ancillary site development and services works
renovation of an existing dwelling including the demolition of an existing attached garage & the application of stone façade to an existing gable end and for the construction of a new dwelling extension to the rear & side of the existing dwelling & all associated site works
1. Change of use from car park into a storage area for completed modular unit and raw materials. 2. Erection of 2.3 metre high Palisade Fence and an electric roller gate at the rear of a splayed entrance on the southern elevation of the yard. 3. Installation of security hut
bin storage shed at the rear of site
a) excavations to viewing embankment and b) construction of a concrete floor slab and PERMISSION to construct a new gymnasium building and all ancillary siteworks