Manserghshill and Graystown townlands, Laffansbridge, Co. Tipperary
Proposed development
Development which comprises the following: 1. Continued use of the existing permitted quarry (Plan File Ref. No. 04/1356 & ABP PL23.221792) which includes: o A block manufacturing facility; o A ready-mix concrete plant; o A garage and maintenance facility; o Office facilities; o ESB substation; o Other ancillary plant and infrastructure. 2. Deepening of the existing quarry floor to a finished level of 60 metres above Ordnance Datum (mOD), remaining entirely within the existing permitted quarry footprint. All within an application area of approximately 36 hectares and for a total period of 34 years (the extraction operational period is for 32 years and a further 2 years for site restoration). The application is accompanied by an Environmental Impact Assessment Report (EIAR)
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
21 Nov 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the historic excavation of part of the existing quarry floor below 110 metres above Ordnance Datum (mOD), to a current floor level of approximately 98–100 mOD, within the existing permitted quarry footprint (Plan File Ref. No. 04/1356 and ABP Ref. PL23.221792), over an area of approximately 4.35 hectares
the historic excavation of part of the existing quarry floor below 110 metres above Ordnance Datum (mOD), to a current floor level of approximately 98–100 mOD, within the existing permitted quarry footprint (Plan File Ref. No. 04/1356 and ABP Ref. PL23.221792), over an area of approximately 4.35 hectares.
the historic excavation of part of the existing quarry floor below 110 metres above Ordnance Datum (mOD), to a current floor level of approximately 98–100 mOD, within the existing permitted quarry footprint (Plan File Ref. No. 04/1356 and ABP Ref. PL23.221792), over an area of approximately 4.35 hectares
1) continued use of the existing permitted quarry (planning file ref. no. 04/1356 & ABP PL23.221792) which includes: a block manufacturing facility; a ready-mix concrete plant; a garage and maintenance facility; office facilities; ESB substation; other ancillary plant and infrastructure; 2) the deepening of the existing quarry floor to a finished level of 60 metres above ordnance datum (mOD), remaining entirely within the existing permitted quarry footprint. All within an application area of approximately 36 hectares and for a total period of 34 years (the extraction operational period is for 32 years and a further 2 years for site restoration). The application is accompanied by an Environmental Impact Assessment Report (EIAR)
an aggregate storage shed (area 1,675 m²) and associated feed hopper, conveyors and screen located within the permitted quarry area (Plan File Ref. No. P04/1356: ABP PL 23.221792), all within an application area of 0.8 Ha.
an aggregate storage shed (area 1,675 m²) and associated feed hopper, conveyors and screen located within the permitted quarry area (Plan File Ref. No. P04/1356: ABP PL 23.221792), all within an application area of 0.8 Ha.