Ballinamore, Clonmel, Co. Tipperary
Proposed development
A - the demolition of the existing barrel-vaulted hay shed including two adjoining lean-to sheds of combined area 240.00sqm, b - the construction of a new combined hay shed and tractor/machine store of total area 903sqm c - the construction of a comms room of area 14sqm d - the erection of two 4m security poles with lighting and two soakaways. All with the associated site development works, planting and served by existing internal roads within the property
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 18 Aug 2026
Timeline
Application received
19 Nov 2025
Council asked for further information
22 Jan 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
20 Apr 2026
Decision due
18 Aug 2026
Decision: conditional
12 Aug 2026
Appeal lodged (PL-502000-TY-26)
Not available
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
A-The demolition of the existing barrel-vaulted hay shed including two adjoining lean-to sheds of combined area 240.00sqm, B-The construction of a new combined hay shed and tractor/machine store of total area 903sqm, C-The construction of a Comms Room of area 14sqm, and D-The erection of 2 number 4m security poles with lighting and 2 number soakaways. All with the associated site development works, planting and served by existing internal roads within the property
the construction of a stable building of area 590.55sqm consisting of 19 stable units, hay storage, exam area, tack room and equipment store. A new storm water soakaway, connection to the existing effluent storage tanks located on site with dung storage on an existing drained concrete hardstanding and subdivision of the remaining site into paddocks of varying sizes. All with the associated site development works and planting
construction of a new single-storey dwelling with detached garage, vehicular entrance, tertiary treatment system and infiltration / treatment area, and associated site boundary and site development works
(1) a two storey extension to the side and single storey sunroom and porch to the front of existing dwelling including all associated site development works, (2) modifications to existing dwelling and demolition of existing single storey extension
a new single-storey dwelling with detached garage, vehicular entrance, tertiary treatment system and infiltration / treatment area, and associated site boundary and site development works
proposed slatted cubicle shed and associated site works