Stooke Water Treatment Plant, Townland of Kilcroe, Co. Tipperary
Proposed development
The raw water gravity filters to be refurbished with new filter laterals, replacement media and extension of an internal weir wall, two 36m³ pre-cast concrete backwash water storage tanks to be constructed to supplement existing wash water holding tank capacity, sodium hydroxide (ph correction) kiosk with duty and standby pumps, sodium hydroxide bulk storage tank, used wash water balance tank with a holding volume of 200m³, lamella clarifier, sludge balancing tank to be located below round with a storage volume of 36m³, sludge thickener to be located above ground, thickened sludge pump station, sludge holding tank with a storage volume of 219m³, poly prep unit to be located in a kiosk (sludge poly kiosk), motor control center (mcc) container for control panels, interconnecting pipework and ducting, extended internal site access road, hardstanding around tanks and chambers, all related site works and ancillary development
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 2 Jan 2026
Timeline
Application received
30 Oct 2025
Decision due
2 Jan 2026
Decision: conditional
16 Dec 2025
Grant issued
28 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
construct an extension to existing dwelling house consisting of 3 bedrooms and kitchen/living area, permission is also sought to upgrade existing septic tank system with new effluent treatment system together with all associated site works
the upgrade of an existing agricultural entrance into a forest road bellmouth to facilitate a timber harvest and haulage operation
the upgrade of existing site entrance to facilitate a timber harvest and haulage operation
development consisting of the construction of 344m of 2.4m high palisade fencing and the installation of one manually operated lockable gate suited to match perimeter fencing
development consisting of the construction of 344m of 2.4m high palisade fencing and one manually operated lockable gate suited to match perimeter fencing
construction of a dwelling house, entrance, effluent treatment system together with all associated site works