Ballygammane and adjacent to existing Thurles 110kV substation, Thurles, Co. Tipperary
Proposed development
Battery Energy Storage System (BESS) development which will consist of a new site entrance and access track, site security fencing including a noise acoustic barrier, access gates, BESS enclosures, a BESS intake substation, MV skid, a back-up generator, a monitoring house, an auxiliary transformer, spares containers, CCTV, an onsite toilet, carparking, a temporary construction stage compound area, landscaping and all associated ancillary development services and works, all to be provided within a total overall application boundary of 2.69 ha. Permission is sought for the proposed BESS development for a period of 10 years with an operational period of 40 years. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and will be subject to a completeness check under Section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application will be submitted to An Coimisiún Pleanála to obtain permission for a 110kV substation on site.
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
29 Aug 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a Battery Energy Storage System (BESS) development to consist of a new site entrance and access track, site security fencing including a noise acoustic barrier, access gates, BESS enclosures, a BESS intake substation, MV skid, a back-up generator, a monitoring house, an auxiliary transformer, spares containers, CCTV, an onsite toilet, carparking, a temporary construction stage compound area, landscaping and all associated ancillary development services and works, all to be provided within a total overall application boundary of 2.69 ha. Permission is sought for the proposed BESS development for a period of 10 years with an operational period of 40 years. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application will be submitted to An Coimisiún Pleanála to obtain permission for a 110kV substation on site
1) domestic garage/store, 2) sunroom to side of existing house, 3) conversion of existing domestic garage to a bedroom and ensuite including alterations to roof and front elevation, 4) additional window to side elevation and 5) all associated site works
a) construction of a new, part two-storey, part single-storey detached dwelling, b) new detached garage, c) new site access, d) new connections to existing utilities, e) new waste-water treatment system and percolation area and f) all associated site works
construction of a 36 m high lattice type communication structure carrying antennae, dishes and ancillary equipment located within a 2.4 m high palisade compound
the construction of a 36m high lattice communication structure carrying dishes, antennae and associate equipment all within a 2.4 m high palisade compound
construction of 1 no. A+-30 Mvar STATCOM transformer, 1 no. auxillary transformer, 3 no. reactors and 1 no. outdoor cooling bank, control and valve building (233m2), 1 harmonic filter, 1 HV circuit breaker (including CT and VT), 1 MV disconnector and earth switch, 2 no. cable sealing ends, 1 no. 110kV feeder bay, 1 busbar connection and underground connection to existing ESB Thurles 110 kV substation, security fencing, security gate, 7 no. 22m high lightning masts, permeable and non-permeable surfacing, additional internal access road, additional fencing to match existing 2.6 m high palisade and all other ancillary site development works and 2 temporary contractors compounds (the development is an extension to the existing substation and this extension has an overall site area (within the planning application boundary) of 1.839ha. In operation the STATCOM would be accessed through the existing gated entrance to the site via the local road to the immediate South. During construction, temporary access is proposed to the east of the existing substation. A Natural Impact Statement (NIS) has been prepared as part of this application)