St. Patrick’s College, Cathedral Street, Thurles Co. Tipperary
Proposed development
(1) a new sports pavilion building with rooftop viewing terrace, (2) new all weather pitch with associated fencing and floodlighting, (3) realignment of existing perimeter path and (4) paths and access road, bicycle shelter together with all associated services and site development works. The works are in the curtilage of a Protected Structure
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 1 Jun 2026
Timeline
Application received
20 Aug 2025
Council asked for further information
8 Oct 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
7 Apr 2026
Decision due
1 Jun 2026
Decision: conditional
21 May 2026
Grant issued
24 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
unauthorised development consisting of change of use of attached garage to living accommodation, provision of en-suite to first floor together with all associated works
single storey extensions to the side and rear, raise the height of existing boundary walls to the rear east and the rear west of the site, revisions to the internal layout, connection to existing services and all associated site works to the existing 2 storey semi detached house
the amendments to the permitted residential development of 32 no. houses (Planning Ref. 20/424), with no change to the number of houses permitted. The amendments comprise revisions to the site layout, revised driveway arrangements and the relocation of visitor car parking spaces; revisions to roof design and elevations; adjustments to finished floor levels in blocks E and G; and all associated site development works
the change of use of existing hair/beauty salon to residential accommodation and all associated site works
the addition of a 6.5 metre totem sign with yellow acrylic internally illuminated "Golden Arch", located on the western side of the site, and all associated works necessary to facilitate the development. The McDonald’s drive-thru restaurant is permitted on site under planning permission reg. ref. 2460829/ACP ref. 322465-25 and is now under construction
• conversion of rear single storey outhouse to kitchen • alterations to existing dwelling to include rear extension to living room and corridor to connect the kitchen on ground floor • changes to elevations and rear roof on dwelling • and all associated site works