128 – 130 Main Street, Templemore, Co. Tipperary
Proposed development
The following unauthorised development:- 1) partial change of use from bank to gym / wellbeing hub, 2) alteration to existing building, including internal alterations, and forming door at east gable of main house to form an access door off shared laneway, 3) installation of modular building to rear yard, 4) erection of lightweight fencing to separate rear yard from garden area, 5) replacement of rear fire exit door and 7 no. rear windows and 6) signage and associated works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 19 Feb 2026
Timeline
Application received
15 Aug 2025
Council asked for further information
6 Oct 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
12 Dec 2025
Decision due
19 Feb 2026
Decision: conditional
16 Feb 2026
Grant issued
22 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
demolition of attached garage, detached boiler house and detached shed, construct first floor side extension and ground floor rear extension, alterations to elevations, move and upgrade existing entrance to improve sight lines and all associated works
a) the conversion of an existing garage to habitable accommodation, b) construction of a single storey extension to the rear of existing dwelling house, c) widening of an existing entrance, d) all associated site works
1) RETENTION for dwelling house as constructed 2) Revised Site Boundaries 3) Rear Domestic Fuel Store 4) Connection to public sewer system And PERMISSION to 1) Change of use of existing attached garage to living accommodation 2) Extension to front elevation of dwelling house 3) All associated site works
the change of use of an existing butcher shop premises to a fast-food takeaway with no customer seating, together with associated internal alterations and fit-out works, installation of extraction and ventilation equipment, replacement fascia signage and all associated site works
the change of use of the ground floor retail unit from commercial to residential use and alterations to the existing building, including modifications to the roof at the rear of the building, and all associated site development works
development which will consist of a change of use of the ground floor retail unit from commercial to residential use and alterations to the existing building, including modifications to the roof at the rear of the building, and all associated site development works