Bohernamona, Thurles, Co. Tipperary
Proposed development
The demolition of 3 sqm utility room to rear of existing cottage and construction of a new 95 sqm single storey extension to rear and associated internal alterations and fabric upgrade to existing single storey cottage, relocation of existing site entrance, demolition of adjacent farm structures, new treatment system and polishing filter and all associated site
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 22 Sept 2025
Timeline
Application received
29 Jul 2025
Decision due
22 Sept 2025
Decision: conditional
19 Sept 2025
Grant issued
23 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a) a new calf rearing shed and machinery shed; b) PLANNING PERMISSION for the demolition of an existing livestock shed and underground slatted slurry storage tanks; c) PLANNING PERMISSION for the construction of a livestock shed to include cubicles and underground slatted slurry storage tanks; d) PLANNING PERMISSION for the construction of a roofed collecting yard with underground slurry storage tanks; e) PLANNING PERMISSION for the construction of a silage pit and all associated site works
existing single storey extension to rear of dwelling, retention permission is also sought for two first floor bedrooms, permission is also sought for new effluent treatment system to replace existing septic tank together with all associated site works
the construction of a residential development, comprised as follows: 94 no. dwellings, comprised of 7 no semi detached 4-bedroom House type A, 11 no. semi-detached 4 -bedroom 2-storey House Type A1, 21 no. 2-storey semi-detached 3-bedroom House Type B, 12 no. 2-storey semi-detached 3-bedroom House Type B1, 12 no. 2-storey semi-detached 3-bedroom House Type C, 8 no. 2-storey semi-detached 3-bedroom House Type C1, 12 no. 2-storey 3-bedroom House Type D (8 no. semidetached & 4 no. terraced units), 3 no 2-storey 3-bedroom House Type F (2 no. semidetached & 1 no. terraced units), 8 no. 1-bedroom own door duplex units House Type DU1 (4 no. ground floor & 4 no. first floor); the creation of a new cycleway, pedestrian walkway alongside Bohernamona Road, connecting to Loughtagalla Park, is proposed within the site; a creche building of 475 sq.m. for 57 no. childcare spaces is also proposed, as is the provision of amenity public open space to serve the development, together with the provision of internal access roads and footpaths, associated car parking spaces and bicycle parking spaces, and all associated site works, boundary treatments, site lighting, tree planting and earthworks, together with connection to mains foul drainage systems. The development is a first phase of the overall development of these lands
the construction of a residential development, comprised as follows: 94 no. dwellings, comprised of 7 no semidetached 4-bedroom House type A, 11 no. semi-detached 4 -bedroom 2-storey House Type A1, 21 no. 2-storey semi-detached 3-bedroom House Type B, 12 no. 2-storey semi-detached 3-bedroom House Type B1, 12 no. 2-storey semi-detached 3-bedroom House Type C, 8 no. 2-storey semi-detached 3-bedroom House Type C1, 12 no. 2-storey 3-bedroom House Type D (8 no. semidetached & 4 no. terraced units), 3 no 2-storey 3-bedroom House Type F (2 no. semidetached & 1 no. terraced units), 8 no. 1-bedroom own door duplex units House Type DU1 (4 no. ground floor & 4 no. first floor); the creation of a new cycleway, pedestrian walkway alongside Bohernamona Road, connecting to Loughtagalla Park, is proposed within the site; a creche building of 475 sq.m. for 57 no. childcare spaces is also proposed, as is the provision of amenity public open space to serve the development, together with the provision of internal access roads and footpaths, associated car parking spaces and bicycle parking spaces, and all associated site works, boundary treatments, site lighting, tree planting and earthworks, together with connection to mains foul drainage systems. The development is a first phase of the overall development of these lands
the construction of a new Gym and Storage Shed to the north of our existing site and all associated site works
a residential development consisting of 86 no. residential units (consisting of 5 no. detached houses, 60 no. semi-detached houses and 21 no. terraced houses) including a two storey 230sqm Creche and a pumping station. Decommissioning of an existing wastewater treatment plant, removal of derelict infrastructure and all associated site works on lands - NIS submitted as part of application